Close
MCE 2026
Friday, January 30, 2026
JEC WORLD 2026

Russian construction plunged into Covid-19 crisis

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Interior Finishing Touches That Make a Remodel Look Complete

A remodel rarely fails because of poor structure or...

How Advanced Rigging Solutions Keep Large Construction Projects on Schedule

Large construction projects live and die by their schedules....

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...
- Advertisement -
Advancing Prefabrication 2026

A report from the Eastern European Construction Forecasting Association (EECFA) has revealed that, as confirmed cases of the  Covid-19 virus soar, the government is insistent that construction projects remain on track.

Only projects in Moscow and the Moscow region have been curtailed, where the largest number of virus cases have been recorded.

Yesterday, Russia reported an increase of 10,600 in confirmed cases – the biggest daily rise since the crisis began – and the figure for the entire country now stands at more than 145,000 cases.

EECFA reports that the construction industry is likely to be one of the hardest hit, with social distancing on construction sites extremely difficult to maintain.

The Russian news agency Tass reported late last week that the country’s construction minister, Vladimir Yakushev and his deputy  Dmitry Volkov had both contracted the coronavirus.

As its two most senior figures now face their own battles with the virus, the Ministry of Construction is under pressure to develop an anti-crisis programme for the industry, set to include subsidising interest rates on mortgage loans to support demand for property, as well as credit and tax moratorium for developers and measures to reduce the cost of project financing.

According to EEFCA, the government is also considering the possibility of having state-owned companies purchase unsold apartments from developers. Furthermore, until January 1, 2021 housing developers will not face punitive action, should the completion of residential building projects be delayed.

In non-residential and civil engineering segments, as support measures, the Ministry plans to increase a number of government contracts and lift advances on those contracts from 30% to 50%.

Achema Middleeast

Latest stories

Related stories

Interior Finishing Touches That Make a Remodel Look Complete

A remodel rarely fails because of poor structure or...

How Advanced Rigging Solutions Keep Large Construction Projects on Schedule

Large construction projects live and die by their schedules....

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...

5 Best Construction Arbitration Services for Contractors in 2026

Contract breaches, project delays and unexpected budget overages happen,...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »