Close
World of Concrete
Saturday, October 17, 2026
AHR Expo 2027

Contractors ‘sleepwalking into danger’ over fire door errors

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

Researchers Develop Biocementation for Construction

Researchers are developing a bacteria-based alternative to conventional cement...

POSCO Advances Hydrogen Steelmaking Under Korea’s K-GX Plan

POSCO Holdings is partnering with the Government of the...

AGSI Sets UAE Benchmark for Low-Carbon Rebar Production

Arabian Gulf Steel Industries (AGSI) has reported a verified...
- Advertisement -
Super Terminal Expo 2026

Most fire doors are being fitted incorrectly, according to industry statistics.

On the third anniversary of the creation of the Fire Door Inspection Scheme (FDIS), Europe’s first qualification and inspection scheme for fire door safety, it has emerged that 61% of fire doors inspected had problems with fire or smoke seals.

Fire door inspector Clive Reilly, who in 2012 became the first person to qualify as a fire door inspector, said that many contractors and their clients are “sleepwalking into danger”. Despite the inspection scheme, there is increasing evidence coming to light of newly installed fire doors which contractors are not fitting in accordance with manufacturers’ instructions, relevant fire test evidence or even in accordance with industry best practice.

Surveys have shown that nearly a quarter of doors have been fitted with unsuitable hinges and on many occasions fire doors were found on inspection to have gaps bigger than the required 3mm between the door and its frame.

Clive Reilly said: “There is no doubt that many people are waking up to the need to have their fire doors inspected. However, it is not uncommon to find newly installed fire doors with hardware which has fixings missing or with unsuitable frames. Usually the contractor and the building manager will think these doors have been installed correctly and will perform as required in the event of a fire. It is only when, or even if, the doors are inspected by someone who knows what to look for that these problems are found, by which time they will have to pay for remediation or replacement.”

Never miss a packaging headline

The packaging industry moves fast – stay on top of it with our must - read briefings.

  • The top packaging and consumer goods stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments reshaping global packaging markets

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Latest stories

Related stories

Researchers Develop Biocementation for Construction

Researchers are developing a bacteria-based alternative to conventional cement...

POSCO Advances Hydrogen Steelmaking Under Korea’s K-GX Plan

POSCO Holdings is partnering with the Government of the...

AGSI Sets UAE Benchmark for Low-Carbon Rebar Production

Arabian Gulf Steel Industries (AGSI) has reported a verified...

Tata Steel and RAEng Advance Circular Materials Innovation

Tata Steel and the Royal Academy of Engineering (RAEng)...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »