Close
ALUMINIUM CHINA2026
Sunday, May 24, 2026
CSPI Expo 2026

Lanes wins drainage contract for new Mersey bridge

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Why Trust Has Become the Primary Decision Factor in Construction Equipment Rental

Selecting a construction equipment rental partner is no longer...

Why Single-Site Monitoring Tools Break Down When You Add More Facilities

There is a pattern that repeats itself across industrial...

The legal rights of injured ironworkers: Navigating the complexities of third-party liability claims

Ironworkers face unique hazards on construction sites, often resulting...
- Advertisement -

Alstom signs €190m Cairo metro dealVinci wins Auckland street lighting contractKier wins Durham student halls schemeFive compete for £90m Bristol ArenaBAM signs Utrecht rail contract

Lanes Group has won a contract for drainage survey and maintenance services to the Mersey Gateway project – the new road crossing over the River Mersey in Halton.

Drainage engineers based at Lanes’ depot in Chester are working for the Merseylink Civil Contractors Joint Venture, the joint venture of FCC, Kier, and Samsung that is building the £600m cable stayed bridge. The crossing is scheduled to open in autumn 2017.

Lanes Group has been contracted to provide a range of services, including CCTV drainage surveys, drainage cleaning and unblocking, and remedial work on existing and new drainage infrastructure.

Thousands of metres of concrete, plastic, and clay drainage pipes, from 100mm in diameter upwards, will be cleaned over the contract period.

It is using a truck-mounted JHL Recycler jet vacuumation tanker, made by Denmark’s J Hvidtved Larsen, to carry out the pipe cleaning work. This vehicle can filter and reuse dirty water, reducing the need to leave site to refill its water tank.

Mainline CCTV drainage camera teams will carry out surveys of the existing and newly-installed drainage system supporting the road development, using a range of techniques, including using robotic crawler camera.

Achema Middleeast

Never miss a construction headline

The construction industry moves fast – stay on top of it with our must - read briefings.

  • The top construction and infrastructure stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping global construction markets

Latest stories

Related stories

Why Trust Has Become the Primary Decision Factor in Construction Equipment Rental

Selecting a construction equipment rental partner is no longer...

Why Single-Site Monitoring Tools Break Down When You Add More Facilities

There is a pattern that repeats itself across industrial...

The legal rights of injured ironworkers: Navigating the complexities of third-party liability claims

Ironworkers face unique hazards on construction sites, often resulting...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »