Close
Tuesday, August 26, 2025

TBM completed for Bangkok Blue Line Extension project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Trimble, Hyundai Announce Trimble Ready 3D Option for Hyundai HD130A Bulldozers

Trimble and Hyundai Construction Equipment announced the availability of...

Lowe’s Announces Agreement to Acquire FBM for $8.8 Billion

Lowe's Companies, Inc. announced a definitive agreement to acquire...

What Is the Best Platform to Buy Online Regulatory Compliance Training?

Construction companies must adhere to laws, regulations and industry...

Ahlstrom Launches Flame-Gardâ„¢ Facers for Fire-Resistance Construction

Ahlstrom, a global leader in fiber-based specialty materials, introduces...

The assembly and testing of the 6.44m diameter TBM for the Bangkok Metro Blue Line Extension contract 1 was completed late last month.

The Terratec EPB-TBM was designed and produced by Terratec in cooperation with Japan Tunnel Systems Corporation, subsidiary of IHI Group, Terratec announced.

The EPB shield has been customised for the project, with a IHI design of a cone-type CutterHead for positive cutting of any concrete piles that may be encountered. Terratec provided the Tunnel Belt Conveyor System and has deployed a crew to assist during the assembly and commissioning of the TBM and Conveyor System. The shield machine diameter is 6.44m and the tunnel length is 5,100m. The daily advancement average is expected to be 10 to 15m.

The Bangkok Blue Line Extension is the second phase of the subway system in Bangkok and the project is designed to mitigate the growing traffic problem in the Metropolitan area and better serve commuters who live in the outskirts. The project is expected to be completed by 2015.

Latest stories

Related stories

Trimble, Hyundai Announce Trimble Ready 3D Option for Hyundai HD130A Bulldozers

Trimble and Hyundai Construction Equipment announced the availability of...

Lowe’s Announces Agreement to Acquire FBM for $8.8 Billion

Lowe's Companies, Inc. announced a definitive agreement to acquire...

What Is the Best Platform to Buy Online Regulatory Compliance Training?

Construction companies must adhere to laws, regulations and industry...

Ahlstrom Launches Flame-Gardâ„¢ Facers for Fire-Resistance Construction

Ahlstrom, a global leader in fiber-based specialty materials, introduces...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back