Close
MCE 2026
Thursday, January 8, 2026
JEC WORLD 2026

Teenage trainee killed testing live panel

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...

Getting Field Workers to Actually Use Time Tracking Systems: What Works

Time tracking technology fails in construction for one simple...

The ROI of Getting Submittals Right the First Time

Every construction project manager knows the drill: submit, reject,...
- Advertisement -
Advancing Prefabrication 2026

Grundfos Pumps Limited has been fined £300,000 after a trainee design engineer lost his life.

19-year-old trainee design engineer Jake Herring came into contact with a live three-phase electrical system and died from his injuries. He was carrying our electrical testing work at the Grundfos Pumps factory in Windsor and was working unsupervised while testing a live electrical control panel.

Grundfos Pumps, was this week prosecuted for the incident, which took place on 30th March 2009. Jake

The company appeared at Reading Crown Court on Monday 11th May 2015 and was fined £300,000,  with total costs of £115,000 after pleading guilty to breaching the Management of Health and Safety at Work Regulations 1999 3, (1) (a), and the Electricity at Work Regulations 1989 Reg 3, (1)(a), contrary to Regulation 14.

Health & Safety Executive inspector Paul Williams said: “This tragic incident could and should have been avoided.  Grundfos Pumps Limited’s failure to adequately risk assess the electrical testing process led to an unsafe system work being in place. Training and supervision arrangements were clearly inadequate. If live electrical testing has to be undertaken, suitable precautions must be in place.”

Advancing Prefabrication 2026

Latest stories

Related stories

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...

Getting Field Workers to Actually Use Time Tracking Systems: What Works

Time tracking technology fails in construction for one simple...

The ROI of Getting Submittals Right the First Time

Every construction project manager knows the drill: submit, reject,...

How Waterjet Cutting Technology Is Transforming Prefabricated Building Components

Introduction Waterjet cutting technology is a manufacturing process that uses...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »