Close
WORLD OF CONCRETE
Friday, December 26, 2025
JEC WORLD 2026

Ocon secures $8 million student housing project in Birmingham

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Cable Installation and Protection in Marine Applications

Electrical systems in marine environments face saltwater, moisture, vibration...

The UK Government Plans on a Single Construction Regulator

The UK government has announced its plans to establish...

What Are the Best Options for Emergency Power Equipment?

A sudden power outage on a construction site or...
- Advertisement -
Achema Middleeast

Ocon Construction has secured a £5.3 million ($8.20 million) contract from the University of Birmingham to build four new student accommodation blocks at its Edgbaston Campus in Birmingham, UK.

The scheme has been designed by Stephen George & Partners. Pursuant to the design and build contract, the company will build a 140-units student housing scheme by September 2012. The new student accommodation will be a mix of studio accommodation and en-suite study bedrooms in 4/5 bedroom clusters, each having their own kitchen and dining and living areas.

The company will build the facility using a light-weight steel frame. The structures will feature brick and curtain walling envelope. The contract further requires the company to develop a new district heating scheme and divert the services from the existing blocks to the new district heating network.

The project will enhance the University’s student accommodation provision and make the on-campus residential accommodation more energy efficient.

Achema Middleeast

Latest stories

Related stories

Cable Installation and Protection in Marine Applications

Electrical systems in marine environments face saltwater, moisture, vibration...

The UK Government Plans on a Single Construction Regulator

The UK government has announced its plans to establish...

What Are the Best Options for Emergency Power Equipment?

A sudden power outage on a construction site or...

Comparing Costs: How Much Do Remanufactured Transformers Cost Compared to New Ones?

The adoption of renewable energy, grid modernization and rapid...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »