Close
MCE 2026
Tuesday, March 10, 2026
2026 Mining Türkiye Exhibitor List

Mersey bridge project reaches landmark with temporary structure completed

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Siemens Advances Circuit Protection with New SENTRON ECPD

Siemens Smart Infrastructure has expanded its range of industrial...

What’s the Best-Value Storage Container for Home Renovations? 6 Top Options in Dallas

Dallas renovation timelines can move fast. Crews that require...

WAC Group Launches WAC Architectural Commercial Lighting

WAC Group has introduced WAC Architectural, positioning it as...
- Advertisement -

The first bridge over the Mersey for 54 years has been completed as part of the construction of the new Mersey Gateway crossing.

Merseylink construction workers Thomas Duncalf, left, and Asa Humphrey on the newly completed trestle bridge

The Merseylink construction consortium of FCC, Kier and Samsung C&T, which is building the £600m crossing for Halton Borough Council, has completed the trestle bridge – a temporary bridge that will act as an access platform for construction teams to work from when building the new structure.

It is the first bridge to be built over the River Mersey in Halton since 1961, when the nearby Silver Jubilee Bridge was opened.

The trestle bridge is used by construction vehicles but is not open to public traffic. A lifting section, which can be raised to allow boats to pass, will be installed shortly.

Merseylink project director Richard Walker said: “Completion of the trestle bridge marks another important milestone for the Mersey Gateway project. It will provide us with full access to the river, enabling work to start on the central cofferdam.”

The trestle bridge will be dismantled and removed completely when the new Mersey Gateway Bridge is in place, expected to be in 2017.

Thomas Duncalf, from Runcorn, was one of the first workers to walk across the new trestle bridge. He said: “I’m excited to be working on the project. It’s a great opportunity. My grandad worked on the Silver Jubilee Bridge and it’s an important part of my family history. I feel honoured to be part of the team building the new Mersey Gateway bridge.”

Achema Middleeast

Latest stories

Related stories

Siemens Advances Circuit Protection with New SENTRON ECPD

Siemens Smart Infrastructure has expanded its range of industrial...

What’s the Best-Value Storage Container for Home Renovations? 6 Top Options in Dallas

Dallas renovation timelines can move fast. Crews that require...

WAC Group Launches WAC Architectural Commercial Lighting

WAC Group has introduced WAC Architectural, positioning it as...

Siemens Unveils Human-Centric Autonomous Buildings Strategy

Siemens is using Light + Building 2026 in Frankfurt,...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »