Close
WORLD OF CONCRETE
Saturday, December 20, 2025
JEC WORLD 2026

BAM to deliver Visual Control Tower at Dublin Airport

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

What Are the Best Options for Emergency Power Equipment?

A sudden power outage on a construction site or...

Comparing Costs: How Much Do Remanufactured Transformers Cost Compared to New Ones?

The adoption of renewable energy, grid modernization and rapid...

What Is the Most Affordable Way to Clean Heat Exchangers and Turbines?

Heat exchangers and turbines move heat, convert energy and...
- Advertisement -
Achema Middleeast

BAM to deliver Visual Control Tower at Dublin Airport

Bunnik, the Netherlands, 8 December 2017 – The Irish Aviation Authority has awarded the construction of the new Visual Control Tower (VCT) at Dublin Airport to BAM Ireland, the Irish operating company of Royal BAM Group nv. The contract value is €27 million.

Designed by Dublin’s Scott Tallon Walker Architects, the new VCT comprises three separate but integrated building elements: the control cab and associated elements, the cab supporting shaft and a base building. The base building will accommodate staff facilities, electronic systems and mechanical plant space to provide control of the building environment. The overall height of the VCT structure will be 87 metres. Site works will include a new car park and a new security station.

Construction activities have already commenced. BAM Ireland expects to complete the project in early 2019.

Further information:
Press: Arno Pronk,
+31 (0)30 659 86 21,
arno.pronk@bam.com

Analysts: Joost van Galen,
+31 (0)30 659 87 07,
joost.van.galen@bam.com

Achema Middleeast

Latest stories

Related stories

What Are the Best Options for Emergency Power Equipment?

A sudden power outage on a construction site or...

Comparing Costs: How Much Do Remanufactured Transformers Cost Compared to New Ones?

The adoption of renewable energy, grid modernization and rapid...

What Is the Most Affordable Way to Clean Heat Exchangers and Turbines?

Heat exchangers and turbines move heat, convert energy and...

How To Choose Trailer GPS Units That Actually Work for UK Fleets

You know the drill. A trailer van goes missing...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »