Close
WORLD OF CONCRETE
Tuesday, October 14, 2025
ACHEMA MIDDLE EAST

Abengoa wins $160 million electricity transmission project in Peru

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

From Design to Delivery: Metal Structural Work in Action

In contemporary construction, metal structural work is the foundation...

Kei Trucks on the Job Site: Small Size, Big Benefits for Construction

When asking to picture a construction vehicle, it’s likely...

Cement Decarbonization by Ecocem with Research Funding

Ecocem, which happens to be one of Europe’s leading...

OBBBA Boosts U.S. Construction and Machinery Firms

As per the Equipment Leasing and Finance Foundation, there...
- Advertisement -

Abengoa S.A., a Spain-based solar energy company, has won a contract from the Peruvian Ministry of Energy and Mining to develop and operate a new $160 million electricity transmission project in the Cuzco region of Peru.

Pursuant to the contract, Abengoa will carry out the engineering, design, construction, maintenance and start-up of the three electricity transmission lines. Altogether, the three lines will cover more than 353.9km and will connect Machupicchu to Tintaya.

The three transmission lines include a 153km long Machupicchu-Quencoro line, a 116km Quencoro-Onocora line and a 84.9km Onocora-Tintaya line. The company will also establish connections to the Quencoro and Quencoro Nueva substations, construct two new substations in Quencoro and Onocora, and extend the substations in Suriray, Quencoro and Tintaya Nueva.

Under the terms of the contract, Abengoa will ensure the highest levels of quality at every stage of the project. The works on the project is likely to span for 38 months. Upon commissioning of the new transmission line, Abengoa will manage the lines for a period of 30 years.

The new electricity transmission project will enable the Cuzco region to meet its energy demand in an efficient and sustainable way. The project will contribute to resolving the problems of overloads, instability and congestion on the lines that currently operate in the south east part of the country.

The Machupicchu-Quencoro-Onocora-Tintaya transmission line will transport electricity to the hydroelectric power plants of Machupicchu, Santa Teresa, Pucará and Quillabamba, as well as, completing the improvements to the National Interconnected Electricity System (SEIN) and other demand centres in southern Peru.

Latest stories

Related stories

From Design to Delivery: Metal Structural Work in Action

In contemporary construction, metal structural work is the foundation...

Kei Trucks on the Job Site: Small Size, Big Benefits for Construction

When asking to picture a construction vehicle, it’s likely...

Cement Decarbonization by Ecocem with Research Funding

Ecocem, which happens to be one of Europe’s leading...

OBBBA Boosts U.S. Construction and Machinery Firms

As per the Equipment Leasing and Finance Foundation, there...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »