Close
MCE 2026
Thursday, January 29, 2026
JEC WORLD 2026

ESC to expand seawater desalination facility in UAE

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...

5 Best Construction Arbitration Services for Contractors in 2026

Contract breaches, project delays and unexpected budget overages happen,...

Top 5 Applications of UAV Drones for Industrial Use in Dubai and Beyond

“UAV drones excel at turning data into actions that...
- Advertisement -
Advancing Prefabrication 2026

Emirates Sembcorp Water & Power Company (ESC) has announced plans to undertake a $200 million project to expand the capacity of the Fujairah 1 Independent Water and Power Plant (IWPP), an operating hybrid desalination plant in the UAE.

The project will increase the seawater desalination capacity of the Fujairah 1 IWPP by 30 million imperial gallons per day (MiGD) to reach a total capacity of 130MiGD. The company plans to utilize reverse osmosis process to increase the capacity of the facility.

Of the total water desalinated at the facility, almost 67.5MiGD will be produced using reverse osmosis, while the remaining 62.5MiGD will be produced using multi-stage flash. The use of multiple processes to desalinate water is likely to make the Fujairah 1 IWPP the largest reverse osmosis desalination facility in the Middle East.

The expansion will also include the installation of a new Dissolved Air Floatation system, which will improve the quality of the seawater feed. ESC has entered into a 20-year water purchase agreement with the Abu Dhabi Water & Electricity Company (ADWEC) for the sale of plant’s 30 MiGD water output from the expansion.

The company has awarded design and build contract to Acciona Agua and Acciona Infraestructuras, members of a Spain-based Acciona Group. Under the contract, the companies will also be responsible for the operation and maintenance services for the expansion project for a period of seven years.

ESC is a joint venture between Sembcorp Gulf Holding Co and Union Power Holding Company, subsidiaries of Sembcorp Utilities and Abu Dhabi Water and Electricity Authority (ADWEA) respectively. Sembcorp holds an effective 40% stake in ESC.

Achema Middleeast

Latest stories

Related stories

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...

5 Best Construction Arbitration Services for Contractors in 2026

Contract breaches, project delays and unexpected budget overages happen,...

Top 5 Applications of UAV Drones for Industrial Use in Dubai and Beyond

“UAV drones excel at turning data into actions that...

What’s the Best Place to Buy a Cargo Trailer? These Are Your 5 Top Options

Having a cargo trailer greatly increases construction teams and...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »