Close
WORLD OF CONCRETE
Wednesday, November 26, 2025
Achema Middleeast

McCarthy tops out $335 million hospital in Missouri

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

How Advanced Aluminum Design Is Shaping the Future of Modern Construction

Modern construction is moving forward at a remarkable pace....

What Are the Best Floating Docks for Marinas? 8 Options to Consider

Floating docks have become the gold standard for modern...

AI-Driven Model Shows Rice Husk Ash Boosts Concrete Capacity

In one of the recent studies that was published...
- Advertisement -

US-based McCarthy Building Companies Incorporated has reached a construction milestone on the new $335 million Mercy Hospital Joplin with the topping out ceremony in Chesterfield, Missouri.

 

Located at the intersection of Interstate 44 and Main St. in Joplin, the new seven-storey, 875,000 square feet hospital will feature more than 260 private rooms. Upon completion, the new hospital will include medical surgical, critical care, women’s/children’s (labour, delivery, recovery and postpartum rooms), behavioural health and rehab.

The bottom three floors of the structure include hospital space, with a seven-storey patient tower and a four-storey clinic tower rising above the hospital space. There is a separate 30,000 square feet central utility plant connected to the main structure by a 450-feet underground tunnel.

The exterior of the building will be completed in November 2013, the central utility plant will be operational by January 2014 and the main structure is expected to open in March 2015. The new hospital will replace the former St. John’s Mercy Regional Medical Center, which was demolished in May 2011 by EF-5 tornado.

 

Latest stories

Related stories

How Advanced Aluminum Design Is Shaping the Future of Modern Construction

Modern construction is moving forward at a remarkable pace....

What Are the Best Floating Docks for Marinas? 8 Options to Consider

Floating docks have become the gold standard for modern...

AI-Driven Model Shows Rice Husk Ash Boosts Concrete Capacity

In one of the recent studies that was published...

Who Offers the Best Heavy Equipment Rental Deals in Texas? Key Factors to Consider

The Texan construction market is defined by rapid urbanization...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »