Close
World of Concrete
Thursday, October 29, 2026
AHR Expo 2027

Sterling and Francine Clark Art Institute unveils $145 million expansion project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

Swiss Steel and Canada Nickel’s Low Carbon Steel Partnership

Swiss Steel Group and Canada Nickel Company have announced...

Building for Resilience Means Building for What Happens When the Grid Goes Down

When a hurricane, wildfire or winter storm takes down...

The Grid Can’t Wait: How Utilities Are Solving the Transformer Lead-Time Crisis

Electric utilities cannot wait two years for new transformers....
- Advertisement -
Super Terminal Expo 2026

The Sterling and Francine Clark Art Institute in Williamstown, Massachusetts, US has announced a $145 million renovation and expansion project that will involve of the Visitor, Exhibition and Conference Center. The renovation project has been designed by Osaka, Japan-based Tadao Ando Architects. The plan calls for creation of a new VECC and renovation of the existing building. The project has been built to qualify for LEED Silver certification.ย 

The VECC of the museum will double as the main entrance as well as visitor reception area of the Sterling and Francine Clark Art Institute. The project involves creation of 10,500 square feet gallery, which is double the size of the current gallery. Also within the scope of the work, a multi-purpose pavilion, dedicated space for family programs and public education, cafe and dining areas will be created.

The plan calls for connecting the old and new building by means of a light filled glass concourse. The original building of the museum also will receive a 2500 square feet glass pavilion.The museum will also get a 1.5 acres reflecting pool that will add to the aesthetic appeal of the building. The reflecting pool will be a joint design effort of Watertown-based landscape architect firm Reed Hilderbrand and Tadao Ando. The pool in the winter months will serve as ice rink. The expansion will also increase the length of the hiking trails to about two miles.The project will create 500 jobs during the construction and renovation of the museum. The entire project is likely to be completed by 2014.

Never miss a packaging headline

The packaging industry moves fast โ€“ stay on top of it with our must - read briefings.

  • The top packaging and consumer goods stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments reshaping global packaging markets

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Latest stories

Related stories

Swiss Steel and Canada Nickel’s Low Carbon Steel Partnership

Swiss Steel Group and Canada Nickel Company have announced...

Building for Resilience Means Building for What Happens When the Grid Goes Down

When a hurricane, wildfire or winter storm takes down...

The Grid Can’t Wait: How Utilities Are Solving the Transformer Lead-Time Crisis

Electric utilities cannot wait two years for new transformers....

Subiaco Wastewater Upgrade Advances Infrastructure Capacity for Perth Development

The Western Australian government has committed an initial AU$105...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป