Close
World of Concrete
Friday, October 16, 2026
AHR Expo 2027

Magil Construction, developer Brivia Group start work on tallest residential tower in Montreal

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

Researchers Develop Biocementation for Construction

Researchers are developing a bacteria-based alternative to conventional cement...

POSCO Advances Hydrogen Steelmaking Under Korea’s K-GX Plan

POSCO Holdings is partnering with the Government of the...

AGSI Sets UAE Benchmark for Low-Carbon Rebar Production

Arabian Gulf Steel Industries (AGSI) has reported a verified...
- Advertisement -
Super Terminal Expo 2026

Construction is officially underway on a $560 million residential tower slated to become one of the tallest buildings in Montreal. Officials from developer Brivia Group and a range of partners broke ground on the so-called 1 Square Phillips project in the city’s downtown July 16.

β€œThe past few months have not been easy, but I am very pleased today to announce that the construction of 1 Square Phillips can begin as planned,” Kheng Ly, Brivia’s president and CEO, said in a release.

Going up at, roughly, Place Phillips and RenΓ©-LΓ©vesque Boulevard, the 61-storey tower is expected to become the tallest residential building in Montreal. It will join several downtown office towers at the top of the city’s skyline, which has long been restricted to no higher than the peak of Mount Royal.

Magil Construction, the project’s general contractor, will be responsible for transforming what’s currently a parking lot into nearly 800 condo and rental units at the busy locale in the business and shopping district. Brivia said excavation at the site is expected to start in the coming weeks.

The exterior of the new building located at Place Phillips and RenΓ©-LΓ©vesque Boulevard.

Menkès Shooner Dagenais LeTourneux Architects took on the design for the tower, in collaboration with New York-based Hill West Architects. Brivia said plans include high-performance windows and green roofs to improve energy efficiency and minimize heat islands.

Along with residential units, the tower will include a lounge and outdoor garden on the 50th floor. A gym and swimming pool are among the other other amenities.

Construction is scheduled to take about four years, with residents expected to begin moving into the tower in 2024.

Never miss a packaging headline

The packaging industry moves fast – stay on top of it with our must - read briefings.

  • The top packaging and consumer goods stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments reshaping global packaging markets

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Latest stories

Related stories

Researchers Develop Biocementation for Construction

Researchers are developing a bacteria-based alternative to conventional cement...

POSCO Advances Hydrogen Steelmaking Under Korea’s K-GX Plan

POSCO Holdings is partnering with the Government of the...

AGSI Sets UAE Benchmark for Low-Carbon Rebar Production

Arabian Gulf Steel Industries (AGSI) has reported a verified...

Tata Steel and RAEng Advance Circular Materials Innovation

Tata Steel and the Royal Academy of Engineering (RAEng)...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate Β»