Close
WORLD OF CONCRETE
Monday, October 13, 2025
ACHEMA MIDDLE EAST

Vinci wins $697 million Swansea University campus contract in UK

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

From Design to Delivery: Metal Structural Work in Action

In contemporary construction, metal structural work is the foundation...

Kei Trucks on the Job Site: Small Size, Big Benefits for Construction

When asking to picture a construction vehicle, it’s likely...

Cement Decarbonization by Ecocem with Research Funding

Ecocem, which happens to be one of Europe’s leading...

OBBBA Boosts U.S. Construction and Machinery Firms

As per the Equipment Leasing and Finance Foundation, there...
- Advertisement -

Vinci Construction UK Limited has been appointed by St. Modwen Properties, Plc, a UK-based regeneration specialist, to deliver the phase I of a £450 million ($696.9 million) Science and Innovation Campus at Swansea University in the UK.

The scope of the contract includes construction of a 65,000 square metres development on the shore front of Swansea Bay, which is expected to deliver research, innovation and education facilities to the city and the surrounding community.

The contract also involves development of more than 25,000 square metres of academic space, along with 899 student apartments, associated retail space, highway works and on site infrastructure.

The academic part of the campus is formed of low rise, modern style buildings incorporating both R&D facilities and teaching space. The student residences are in traditionally styled collegiate blocks arranged in courtyard configurations, including an eight-storey tower with views across the bay.

The project is being developed in compliance with the BRE’s Environmental Assessment Method. The project has received the planning consent in December 2012 and preparatory work has already commenced on site. The work on the phase I is set to be completed in September 2015.

Latest stories

Related stories

From Design to Delivery: Metal Structural Work in Action

In contemporary construction, metal structural work is the foundation...

Kei Trucks on the Job Site: Small Size, Big Benefits for Construction

When asking to picture a construction vehicle, it’s likely...

Cement Decarbonization by Ecocem with Research Funding

Ecocem, which happens to be one of Europe’s leading...

OBBBA Boosts U.S. Construction and Machinery Firms

As per the Equipment Leasing and Finance Foundation, there...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »