Close
MCE 2026
Wednesday, March 25, 2026
2026 Mining Türkiye Exhibitor List

Iofina completes work on iodine extraction plant in North America

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Future Homes Standard 2026 Drives UK Construction Shift

The UK government has confirmed the implementation of the...

How Quality Craftsmanship Extends the Life of Your Roof Repair or Replacement

Most homeowners only think about their roof when something...

SANY, Holcim Advance Electric Construction Equipment Deal

SANY Group and Holcim Group have formalised a Letter...
- Advertisement -

UK-based Iofina plc has completed the construction of the IO#1 iodine extraction plant based on its WET IOsorb technology.

The group said it had completed pouring the concrete pads, installing the pumps, tanks, motors, brine lines, steel bases, IOsorb equipment, structural support steel, crystallisation equipment, crystallisation building and the motor control centre building.

Located in the southwest operations group of Iofina, the group is awaiting connection to the electrical grid by the local electricity company, which is expected to happen by the end of the week.

Iofina will test the plant using fresh water through all tanks, pumps, plumbing and IOsorb equipment for between one and five days. Upon successful hydro-testing, the plant will start running the iodine rich brine through the IOsorb plant.

The plant will use Iofina’s IOsorb technology to identify, develop, build, own and operate iodine extraction plants currently focused in North America.

The firm also has other plants at different stages of development, such as the IO#2 in Oklahoma. The IO#2 IOsorb unit has been fully built and is being shipped to the location for final plant construction.

Achema Middleeast

Latest stories

Related stories

Future Homes Standard 2026 Drives UK Construction Shift

The UK government has confirmed the implementation of the...

How Quality Craftsmanship Extends the Life of Your Roof Repair or Replacement

Most homeowners only think about their roof when something...

SANY, Holcim Advance Electric Construction Equipment Deal

SANY Group and Holcim Group have formalised a Letter...

Salzgitter Initiative Construction to Boost German Market

Salzgitter AG has introduced its new Initiative Construction, marking...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »