Close
MCE 2026
Monday, February 2, 2026
JEC WORLD 2026

MLH selects design and construction team for new Olive Branch hospital in US

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Interior Finishing Touches That Make a Remodel Look Complete

A remodel rarely fails because of poor structure or...

How Advanced Rigging Solutions Keep Large Construction Projects on Schedule

Large construction projects live and die by their schedules....

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...
- Advertisement -
Advancing Prefabrication 2026

Methodist Le Bonheur Healthcare , an integrated health care delivery system, has finalized an integrated project delivery team for the design and construction of new Olive Branch hospital in the US.

The team includes Gresham, Smith and Partners , Smith Seckman Reid and Turner Construction Company. Located on the southeast corner of US Highway 78 and Bethel Road, the full-service, 100-bed hospital will support MLH’s dedication to sustainability.

The new hospital will reportedly support the facility’s mission of uniting with patients and their families in providing high quality, cost-effective patient and family-centred care.

Turner Construction Company will provide construction management services for the project and serve as general contractor. IPD requires the entire building team including the owner, architect, engineers, contractor and subcontractors through all phases of design and construction.

Smith Seckman Reid will be provide engineering design, medical communication system planning, commissioning and LEED facilitation services for the project. The facility is being designed to achieve the US Green Building Council Leadership in Energy and Environmental Design certification. Work on the project is set to commence on 19 October 2011.

Achema Middleeast

Latest stories

Related stories

Interior Finishing Touches That Make a Remodel Look Complete

A remodel rarely fails because of poor structure or...

How Advanced Rigging Solutions Keep Large Construction Projects on Schedule

Large construction projects live and die by their schedules....

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...

5 Best Construction Arbitration Services for Contractors in 2026

Contract breaches, project delays and unexpected budget overages happen,...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »