Close
ALUMINIUM CHINA2026
Thursday, June 25, 2026
LiGHT26

BAM wins contract to build New Jarlsberg Cheese Factory in Mogeely Cork

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

USG Expands Canadian Capacity with Alberta Wallboard Plant

USG Corporation has strengthened the supply of construction materials...

IGBC Green Hospitality Summit Backs Net-Zero Infrastructure

The IGBC Green Hospitality Summit 2026 brought together key...

LEEA Introduces Proficiency Testing

LEEA (Lifting Equipment Engineers Association) is rolling out a...
- Advertisement -

TINE Ireland Ltd – a subsidiary of the Norwegian dairy cooperative TINE – has awarded the construction of a new Jarlsberg® cheese production facility and administration building at Mogeely, Co. Cork, to BAM Ireland.

The contract value is more than €25 million. TINE is Norway’s largest producer, distributor and exporter of dairy products with 11,400 members (owners) and 9,000 cooperative farms.

Jarlsberg® is a mild cow’s-milk cheese with large regular holes, that originates from Norway, but which is also produced abroad under licenses from Norwegian dairy producers. The location of the proposed building is on a greenfield site adjoining the existing Dairygold Mogeely site. The new facility has an estimated capacity of 14,000T of cheese per annum.

Construction will start this month and is due for completion in November 2019. There is a significant volume of earthworks required in order to prepare the site for building foundations. The structure will be a steelwork frame with long spanning trusses (up to 35 metres) and will be clad with Kingspan insulated panels.

The plant includes warm rooms and cool rooms for the different phases of cheese maturing and flavour development. These contain super flat floors for forklift access. Also provided is a brine room with gantry crane. Specialist equipment includes mould presses and vats for the production of curd and whey.

World Construction Today brings together the global construction industry — from contractors and developers to engineers and project owners — through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium construction industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global construction and infrastructure value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

USG Expands Canadian Capacity with Alberta Wallboard Plant

USG Corporation has strengthened the supply of construction materials...

IGBC Green Hospitality Summit Backs Net-Zero Infrastructure

The IGBC Green Hospitality Summit 2026 brought together key...

LEEA Introduces Proficiency Testing

LEEA (Lifting Equipment Engineers Association) is rolling out a...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »