Close
MCE 2026
Saturday, January 10, 2026
JEC WORLD 2026

Nicholson Joins Cleveland’s Westerly Storage Tunnel Project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Amrize Expands in Texas with PB Materials Acquisition Deal

Amrize has gone on to enter into an agreement...

Where to Buy Picture Windows in Ohio

Picture windows are stunning additions to Ohio homes. Whether...

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...
- Advertisement -
Advancing Prefabrication 2026

Pittsburgh-based geotechnical general contractor Nicholson Construction was recently awarded a support of excavation contract for two diaphragm walls as part of the Westerly Storage Tunnel project in Cleveland, Ohio.

The $135 million project, which is owned by the Northeast Ohio Regional Sewer District (NEORSD,) includes approximately 9,600 lf of combined sewer overflow (CSO) storage tunnel excavated in rock and three shafts. The Westerly Storage Tunnel is part of NEORSD’s Project Clean Lake, which is a 25-year program designed to reduce pollution in Lake Erie by four billion gallons per year.

Nicholson’s portion of the work includes the construction of a 42-inch thick, 152-foot deep unreinforced diaphragm wall shaft for support of excavation at the drop shaft, as well as a two-foot thick, 71-foot deep steel reinforced diaphragm wall for support of excavation of the connecting gate structure and a three-foot thick, 175-foot deep unreinforced diaphragm wall for support of excavation for the 20-foot diameter drop structure vent shaft.

The company has an extensive tunneling history in Ohio, having just finished the Dugway Storage Tunnel in Cleveland (also for NEORSD) in 2016 and several projects for the Olentangy Scioto Interceptor Sewer (OSIS) in Columbus in 2012.

About Nicholson Construction Company
Nicholson has been both a leader and an innovator in the geotechnical construction industry for more than 60 years. With regional offices across the country and headquarters located in Pittsburgh, Nicholson is a nationally renowned specialty contractor, offering proven expertise in the design and installation of deep foundation elements, earth retention systems and ground treatment solutions. We pride ourselves on our ability to consistently provide our clients with innovative, high-quality design-build options for projects of varying size and complexity. Nicholson is the North American subsidiary of Soletanche Bachy, one of the world’s leading geotechnical contractors, and is part of a global network of unparalleled geotechnical resources and expertise.

Achema Middleeast

Latest stories

Related stories

Amrize Expands in Texas with PB Materials Acquisition Deal

Amrize has gone on to enter into an agreement...

Where to Buy Picture Windows in Ohio

Picture windows are stunning additions to Ohio homes. Whether...

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...

Getting Field Workers to Actually Use Time Tracking Systems: What Works

Time tracking technology fails in construction for one simple...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »