Close
MCE 2026
Friday, January 9, 2026
JEC WORLD 2026

EwingCole completes design build-project for US Military Academy

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...

Getting Field Workers to Actually Use Time Tracking Systems: What Works

Time tracking technology fails in construction for one simple...

The ROI of Getting Submittals Right the First Time

Every construction project manager knows the drill: submit, reject,...
- Advertisement -
Advancing Prefabrication 2026

US-based EwingCole has announced the completion of a new facility for the US Military Academy Preparatory School .

The design-build project has led to relocation of USMAPS from Fort Monmouth, New Jersey, US to US Military Academy at West Point. EwingCole was the Designer of Record for the project. Work has been executed in phases. The first phase was completed in mid-2011. Phase II, completed in January 2012, involved creation of the academic buildings, lacrosse and football fields. The final phase includes construction of the Athletic Building and is due to be completed soon.

The new facility makes use of brick, granite and a glass curtain wall. It consists of classroom as well as administrative buildings spanning over an area of 73,000 square feet. It also houses dining and exchange facilities. The facilities encompass an overall area of 14,000 square feet.

The site further comprises athletic and fitness area spanning 87,000 square feet. In addition, it incorporates three quarters NCAA athletic fields and quarters dedicated to students. The quarters possess a bed capacity of 246.

The building is positioned like a continuous ribbon which is stretched along the edge of a spacious open plane. The plane is located on a steep hillside. The design of the building leaves the whole plane nearly vacant to enable it to be used as athletic fields. The facility also features a gently curving drive which leads to the academic block’s centre.

Advancing Prefabrication 2026

Latest stories

Related stories

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...

Getting Field Workers to Actually Use Time Tracking Systems: What Works

Time tracking technology fails in construction for one simple...

The ROI of Getting Submittals Right the First Time

Every construction project manager knows the drill: submit, reject,...

How Waterjet Cutting Technology Is Transforming Prefabricated Building Components

Introduction Waterjet cutting technology is a manufacturing process that uses...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »