Close
ALUMINIUM CHINA2026
Monday, June 29, 2026
LiGHT26

Portakabin wins £28m seven-school haul

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

The Construction Technology Upgrades Delivering Real ROI in 2026

Construction technology has moved well past the “nice to...

Why Owners Are Demanding More Predictability Before Ground Is Broken

One of the great paradoxes of today’s construction industry...

Why Equipment Availability Isn’t What It Used to Be

Finding the right heavy equipment used to be as...
- Advertisement -

The Portakabin Group has been named preferred bidder for seven infant and primary school projects in Surrey and Kent.

The contracts for the Department for Education are worth approximately £28m. The projects will be completed by winter 2017 and constructed using Yorkon factory-built modules.

Portakabin director Simon Ambler said: “This is another milestone for the Portakabin Group and for the off-site sector.”

He said: “Off-site construction gives schools the benefits of considerable savings on programme because the sub and super structures are delivered simultaneously; it is safer because work off site is maximised, and the approach reduces disruption – which are all clear advantages when redeveloping fully operational school sites.”

Three of the seven projects are now in the design stages. The first to start on site will be Pyrford Church of England Primary School in Woking.  A £5m primary school will be constructed to accommodate 480 children from the start of the 2016/17 academic year. It will replace an existing single-storey school, which will then be demolished.

 

 

Achema Middleeast

Never miss a construction headline

The construction industry moves fast – stay on top of it with our must - read briefings.

  • The top construction and infrastructure stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping global construction markets

Latest stories

Related stories

The Construction Technology Upgrades Delivering Real ROI in 2026

Construction technology has moved well past the “nice to...

Why Owners Are Demanding More Predictability Before Ground Is Broken

One of the great paradoxes of today’s construction industry...

Why Equipment Availability Isn’t What It Used to Be

Finding the right heavy equipment used to be as...

The Best Electrical Engineering Consulting Services for Utilities in Canada: Why End-to-End Solutions Matter

Canada’s innovative utility sector is under pressure from multiple...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »