Close
WORLD OF CONCRETE
Saturday, December 27, 2025
JEC WORLD 2026

Panama Canal opens tender process for new port

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

DIGICONCRETE to Speed up Quality Control in Construction

ACCIONA has come up with a new digital platform...

EEC Approves Four Liberalization Plans in Construction

At one of the meetings held on December 21st...

Cable Installation and Protection in Marine Applications

Electrical systems in marine environments face saltwater, moisture, vibration...
- Advertisement -
Achema Middleeast

The Panama Canal Authority (ACP) has begun the tender process for a new port on the canal’s Pacific side.

It has issued a request for qualifications (RFQ) for companies interested in competing to design, develop, finance, construct, operate and maintain the Corozal container Terminal.

The decision by the ACP to authorise the RFQ follows confirmation that 13 of the world’s largest port operators have formally expressed an interest to develop and operate the Corozal Port.

“What we’ve seen confirms the strong demand existing for the Canal and the need for greater port capacity on its Pacific side,” said Panama Canal administrator Jorge Quijano. “We’re eager to advance the development of the Port and will ensure the concession is delivered through a transparent and participatory bidding process to bring the best performance possible to the Canal and, therefore, the country.”

The Corozal Container Terminal will be located at the Pacific entrance of the waterway. The final decision to develop the container terminal was made based on more than two years of studies and simulations to ensure the project’s financial and operational viability.

Achema Middleeast

Latest stories

Related stories

DIGICONCRETE to Speed up Quality Control in Construction

ACCIONA has come up with a new digital platform...

EEC Approves Four Liberalization Plans in Construction

At one of the meetings held on December 21st...

Cable Installation and Protection in Marine Applications

Electrical systems in marine environments face saltwater, moisture, vibration...

The UK Government Plans on a Single Construction Regulator

The UK government has announced its plans to establish...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »