Close
Friday, June 27, 2025

£15m Lincolnshire flood schemes start

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Zimbabwe-South Africa Construction Markets Marching Ahead

Zimbabwe-South Africa construction markets are anticipated to continue on...

How to Plan Your Home Renovation Timeline: Expert Tips Homeowners Often Skip

Even with a well-planned renovation timeline, unexpected delays and...

CIC Launches Centre for Future Construction in Hong Kong

The Construction Industry Council (CIC) formally opened the 'Centre...

Leighton wins Auckland motorway contractOsborne wins its first Kent schoolDunne starts third hospital car parkBAM picked for Berlin office complexCarillion confirmed for Midland Met hospital

Contractors have moved on site on two flood alleviation schemes in Lincolnshire.

Machinery has moved on site at Louth to build embankments

The projects are designed to help manage the flow of the River Lud and River Bain.

Both schemes are being carried out by VBA, a joint venture of VolkerStevin, Boskalis Westminster and Atkins. They form part of the Environment Agency’s water and environment management (WEM) Framework.

The £6.5m Louth flood alleviation scheme will see two flood storage areas constructed outside the town, with embankments of 150 metres and 200 metres. Once built, these storage areas will reduce the risk of flooding from the river Lud.

An £8.1m scheme at Horncastle involves the construction of an 800-metre temporary flood storage area, which will hold up to 1.3 million cubic metres of flood water from the River Bain.

Both schemes are funded by a partnership of Lincolnshire County Council, the Environment Agency, East Lindsey District Council, and the Lindsey Marsh and Witham Third Internal Drainage Boards.

“As part of the schemes we will be installing ground-breaking flow control structures, which have never been installed in the UK before and is something the VBA team is especially proud to pioneer,” said VBA senior project manager Steven Hammer.

Latest stories

Related stories

Zimbabwe-South Africa Construction Markets Marching Ahead

Zimbabwe-South Africa construction markets are anticipated to continue on...

How to Plan Your Home Renovation Timeline: Expert Tips Homeowners Often Skip

Even with a well-planned renovation timeline, unexpected delays and...

CIC Launches Centre for Future Construction in Hong Kong

The Construction Industry Council (CIC) formally opened the 'Centre...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back