Close
WORLD OF CONCRETE
Saturday, December 6, 2025
JEC WORLD 2026

Stonehaven flood defence plan takes shape

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Leading GPS Time Tracking Apps for Construction Teams in the US (2026)

Introduction Construction teams often face challenges tracking labor hours across...

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...
- Advertisement -
Achema Middleeast

Plans to reduce the frequency of flooding in Stonehaven have been developed by Aberdeenshire Council and its consultants.

Mott MacDonald is designing a £15 million flood protection scheme in Stonehaven to provide the town with one in 200 year flooding protection from the River Carron.

Public consultation has concluded and the flood order is being promoted this month. Under the envisaged programme, the Stonehaven flood protection scheme will be completed by the end of 2018.

Major flooding events have occurred in the coastal town six times in the past 20 years, necessitating the evacuation of nearby residents. The most recent was in December 2012.

Mott MacDonald is designing flood walls and embankments using 2D hydraulic modelling. The consultancy is also carrying out ground investigation and environmental surveys. Building information modelling is also being used to allow a collaborative approach for all parties involved on the project.

Mott MacDonald project director Stephen Knight said: “We have been improving the efficiency of the initial concept design by reducing piling requirements, overall material volumes and simplifying construction requirements.

“Working with statutory bodies, we are aiming to minimise the impact on the watercourse during construction by maintaining part of the existing river channel where possible.”

 

Achema Middleeast

Latest stories

Related stories

Leading GPS Time Tracking Apps for Construction Teams in the US (2026)

Introduction Construction teams often face challenges tracking labor hours across...

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...

Who Offers the Best Shade Structures for Athletic Facilities? Here’s What You Should Know

The right shade structures for athletic facilities provide comfort,...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »