Close
MCE 2026
Wednesday, January 28, 2026
JEC WORLD 2026

Arup completes engineering works for University of Chicago Laboratory School

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...

5 Best Construction Arbitration Services for Contractors in 2026

Contract breaches, project delays and unexpected budget overages happen,...

Top 5 Applications of UAV Drones for Industrial Use in Dubai and Beyond

“UAV drones excel at turning data into actions that...
- Advertisement -
Advancing Prefabrication 2026

Arup has completed the design and coordination of mechanical, plumbing, and fire protection services (MP/FP) for the Earl Shapiro Hall at the Laboratory Schools Early Childhood Campus in the US.

The 117,000 square foot school facility, which is associated with the University of Chicago, accommodates nursery, kindergarten, and first- and second-grade students from across the city.

Arup worked with executive architect FGM Architects, and design architect Valerio Dewalt Train Associates to determine the functional needs of the facility in the framework of energy efficiency and natural light.

The company engineered a radiant floor system to off-set heat loss and provides regulatory comfort for the children and staff.

Modular multi-stack chillers and condensing boilers were selected for the facility’s central plant.

Arup said providing isolation valves at the modular chillers allows both the chilled water and condensed water systems to operate variable flow, resulting in significant reductions in consumption.

Earl Shapiro Hall, which was opened in the fall of 2013, is targeting LEED Silver certification.

Achema Middleeast

Latest stories

Related stories

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...

5 Best Construction Arbitration Services for Contractors in 2026

Contract breaches, project delays and unexpected budget overages happen,...

Top 5 Applications of UAV Drones for Industrial Use in Dubai and Beyond

“UAV drones excel at turning data into actions that...

What’s the Best Place to Buy a Cargo Trailer? These Are Your 5 Top Options

Having a cargo trailer greatly increases construction teams and...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »