Close
MCE 2026
Friday, January 30, 2026
JEC WORLD 2026

HITT tops out new $45 million apartment building in Washington, DC

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

How Advanced Rigging Solutions Keep Large Construction Projects on Schedule

Large construction projects live and die by their schedules....

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...

5 Best Construction Arbitration Services for Contractors in 2026

Contract breaches, project delays and unexpected budget overages happen,...
- Advertisement -
Advancing Prefabrication 2026

HITT Contracting Incorporated, a US-based general contractor, has announced the topping out of a new $45 million apartment building developed by Quadrangle Development Corporation and The Wilkes Company in Washington, DC.

The new development will include a 14-storey, 233,000 square feet apartment building with 234 units and a 39,000 square feet parking garage. It will have one-bedroom units and two-bedroom units.

The amenities within the building will include a rooftop entertainment suite / club room, a custom rooftop pool with cascading waterfall feature, fire pit, a fitness centre, a serene second floor landscaped terrace and 9,300 square feet of street level retail.

The apartment building is a post-tensioned concrete structure with a mat slab foundation. The rain screen facade features an open-joint Marrazzi porcelain tile with metal panels. Juliet balconies add to the building’s aesthetic and appeal as well as operable windows. The project is scheduled to complete in December 2013.

The project team includes HITT Contracting Incorporated as the general contractor; Davis Carter Scott, Limited as project architect; Design Build Mechanical Corporation and Power Design, Incorporated, MEP design; Fernandez-Associates Structural Engineers P.C., structural; and developers Quadrangle Development Corporation and The Wilkes Company.

Achema Middleeast

Latest stories

Related stories

How Advanced Rigging Solutions Keep Large Construction Projects on Schedule

Large construction projects live and die by their schedules....

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...

5 Best Construction Arbitration Services for Contractors in 2026

Contract breaches, project delays and unexpected budget overages happen,...

Top 5 Applications of UAV Drones for Industrial Use in Dubai and Beyond

“UAV drones excel at turning data into actions that...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »