Close
ALUMINIUM CHINA2026
Thursday, June 25, 2026
LiGHT26

HITT tops out new $45 million apartment building in Washington, DC

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

Why Owners Are Demanding More Predictability Before Ground Is Broken

One of the great paradoxes of todayโ€™s construction industry...

Why Equipment Availability Isn’t What It Used to Be

Finding the right heavy equipment used to be as...

The Best Electrical Engineering Consulting Services for Utilities in Canada: Why End-to-End Solutions Matter

Canadaโ€™s innovative utility sector is under pressure from multiple...
- Advertisement -

HITT Contracting Incorporated, a US-based general contractor, has announced the topping out of a new $45 million apartment building developed by Quadrangle Development Corporation and The Wilkes Company in Washington, DC.

The new development will include a 14-storey, 233,000 square feet apartment building with 234 units and a 39,000 square feet parking garage. It will have one-bedroom units and two-bedroom units.

The amenities within the building will include a rooftop entertainment suite / club room, a custom rooftop pool with cascading waterfall feature, fire pit, a fitness centre, a serene second floor landscaped terrace and 9,300 square feet of street level retail.

The apartment building is a post-tensioned concrete structure with a mat slab foundation. The rain screen facade features an open-joint Marrazzi porcelain tile with metal panels. Juliet balconies add to the building’s aesthetic and appeal as well as operable windows. The project is scheduled to complete in December 2013.

The project team includes HITT Contracting Incorporated as the general contractor; Davis Carter Scott, Limited as project architect; Design Build Mechanical Corporation and Power Design, Incorporated, MEP design; Fernandez-Associates Structural Engineers P.C., structural; and developers Quadrangle Development Corporation and The Wilkes Company.

Achema Middleeast

Never miss a construction headline

The construction industry moves fast โ€“ stay on top of it with our must - read briefings.

  • The top construction and infrastructure stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping global construction markets

Latest stories

Related stories

Why Owners Are Demanding More Predictability Before Ground Is Broken

One of the great paradoxes of todayโ€™s construction industry...

Why Equipment Availability Isn’t What It Used to Be

Finding the right heavy equipment used to be as...

The Best Electrical Engineering Consulting Services for Utilities in Canada: Why End-to-End Solutions Matter

Canadaโ€™s innovative utility sector is under pressure from multiple...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป