Close
MCE 2026
Sunday, February 1, 2026
JEC WORLD 2026

ABB wins $18 million order for modernization of cement plant in India

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Interior Finishing Touches That Make a Remodel Look Complete

A remodel rarely fails because of poor structure or...

How Advanced Rigging Solutions Keep Large Construction Projects on Schedule

Large construction projects live and die by their schedules....

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...
- Advertisement -
Advancing Prefabrication 2026

Swiss power and automation technology group ABB has won an $18 million contract to design, engineer and supply integrated automation and modern electrification systems for Century Cement’s Manikgarh Cement plant in India.

Manikgarh Cement provides cement products for building construction, road and bridge infrastructure and other commercial uses. ABB’s delivery is part of a two line expansion and plant modernization project that will add production capacity of 2.8 million tons of cement per year, more than doubling its current production. The project also includes a 60MW thermal power plant onsite.

ABB will provide manufacturing technology to expand production capacity and maintain high product quality while providing a reliable on-site power supply that will improve energy efficiency.

Veli-Matti Reinikkala, head of ABB’s Process Automation division, said that the modernization and expansion project will help the customer meet increasing the local demand for its product, while improving the overall efficiency of its production process, and stability of its electricity supply.

ABB will deliver integrated power and automation systems using a plant-wide 800xA automation system to control, connect, and optimize the performance of all processes and systems.

Scope of supply includes medium-voltage switchgear, distribution transformers and other electrical equipment and power systems, intelligent low-voltage motor control centers, variable speed drives, instrumentation, and collaborative production management systems. ABB will also provide design, engineering, project commissioning, and other site services. The turnkey project is scheduled to be completed within 18 months.

Achema Middleeast

Latest stories

Related stories

Interior Finishing Touches That Make a Remodel Look Complete

A remodel rarely fails because of poor structure or...

How Advanced Rigging Solutions Keep Large Construction Projects on Schedule

Large construction projects live and die by their schedules....

How Trailer GPS Tracking Improves Turnaround Time and Asset Utilisation

Trailers are the most useful and least controlled products...

5 Best Construction Arbitration Services for Contractors in 2026

Contract breaches, project delays and unexpected budget overages happen,...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »