Close
ALUMINIUM CHINA2026
Tuesday, May 26, 2026
CSPI Expo 2026

Alstom, SSE Renewables to develop wave energy project offshore Scotland

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

Where AI Actually Earns Its Keep on a Jobsite (And Where It Doesn’t Yet)

The AI conversation in construction has finally moved past...

Why Trust Has Become the Primary Decision Factor in Construction Equipment Rental

Selecting a construction equipment rental partner is no longer...

Why Single-Site Monitoring Tools Break Down When You Add More Facilities

There is a pattern that repeats itself across industrial...
- Advertisement -

French energy infrastructure company Alstom and SSE Renewables have signed a new joint venture agreement to develop the Costa Head Wave Project, an up to 200MW wave energy site, off the coast of Orkney, Scotland.

The Costa Head site is located in water depths of 60 to 75m approximately 5km to the north of Orkney Mainland. Alstom and SSE Renewables propose to carry out detailed site surveys and an environmental impact assessment (EIA), to develop the site with an initial phase capacity of around 10MW, before moving on to install the full site capacity.

Alstom and SSE Renewables will work closely to secure necessary approvals and intend to install AWS-III wave energy converters at the site. AWS-III is a technology currently under development by AWS Ocean Energy Limited, a firm in which Alstom acquired a 40% equity share in June 2011.

The AWS-III technology consists of a multi-cell array of flexible membrane absorbers which convert wave power to pneumatic power through compression of air within cells that are inter-connected. Turbine-generator sets are provided to convert pneumatic power to electricity.

An AWS-III device will comprise an array of 12 cells, each measuring around 16m wide by 8m deep, arranged around a structure with overall beam of up to 60m. Such a device has a capacity of 2.5 MW whilst having a structural steel weight of less than 1300 tonne.

The AWS-III will be slack moored in water depths of 65 to 150m using standard mooring spreads. Devices will be arranged in arrays or โ€˜farmsโ€™ of up to several hundred MW total rating. Each AWS-III will be connected to a central offshore substation via a high-voltage umbilical link.

Achema Middleeast

Never miss a construction headline

The construction industry moves fast โ€“ stay on top of it with our must - read briefings.

  • The top construction and infrastructure stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping global construction markets

Latest stories

Related stories

Where AI Actually Earns Its Keep on a Jobsite (And Where It Doesn’t Yet)

The AI conversation in construction has finally moved past...

Why Trust Has Become the Primary Decision Factor in Construction Equipment Rental

Selecting a construction equipment rental partner is no longer...

Why Single-Site Monitoring Tools Break Down When You Add More Facilities

There is a pattern that repeats itself across industrial...

The legal rights of injured ironworkers: Navigating the complexities of third-party liability claims

Ironworkers face unique hazards on construction sites, often resulting...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป