Close
WORLD OF CONCRETE
Thursday, October 30, 2025
Liftex 2025

Hardin Construction Company to build University of St Augustine’s third campus

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Where Can I Buy ADA-Compliant Playground Surfacing? 7 Options

Safe play environments are essential for children of all...

From Toolbox Talk to Wallet Card: A 3-Step Forklift-Safety Program Any GC Can Deploy This Week

Jobsite delays rarely come from a lack of hustle—they...

Construction Essentials: What Are the Most Common Types of Heavy Equipment Used?

Heavy construction equipment is a critical asset, as it...

Why Every Industry Needs Safety T-Shirts for Worker Protection

Worker safety is a top priority across all industries....
- Advertisement -

Atlanta-based construction firm Hardin Construction Company has been chosen for construction of the third campus of the University of St. Augustine for Health Sciences in southwest Austin, Texas. The new campus will be located on a 27.7-acre site and will possess a capacity to house about 500 students. The campus will consist of two, two-storeyed buildings. These facilities will feature 80,000 square feet of labs and classrooms which will be designed after auditoriums. Other features of the buildings include library and research amenities, office and administrative areas, indoor and outdoor student lounge spaces for students, and a surface parking lot with a capacity of 240.

The structures will be equipped with a host of advanced applications and will be designed to boost student-centric education. These include the facility’s academic areas which will house student groups to facilitate interactive learning sessions, and tiered and arched auditorium classrooms which will create more interaction amongst students.The project is due to be completed by June 2012.

Latest stories

Related stories

Where Can I Buy ADA-Compliant Playground Surfacing? 7 Options

Safe play environments are essential for children of all...

From Toolbox Talk to Wallet Card: A 3-Step Forklift-Safety Program Any GC Can Deploy This Week

Jobsite delays rarely come from a lack of hustle—they...

Construction Essentials: What Are the Most Common Types of Heavy Equipment Used?

Heavy construction equipment is a critical asset, as it...

Why Every Industry Needs Safety T-Shirts for Worker Protection

Worker safety is a top priority across all industries....

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »