Close
MCE 2026
Tuesday, January 13, 2026
JEC WORLD 2026

North-south line of Amsterdam tunnel is at depth

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

- Advertisement -
Advancing Prefabrication 2026

The last tunnel section of the north-south line that will form the connection between Amsterdam Central Station and the bored tunnels is in place, it was revealed last week.

The job took two and a half months to complete; workers now awaits the caisson at approximately 21m to be connected to the two tunnel sections. This is the last missing tunnel section between metrohal of Central and bored tunnels of the north-south line from the Damrak canal.

Achema Middleeast

Latest stories

Related stories

Croatia Introduces New Package of Three Laws in Construction

In a recent update, a new package of three...

Nuvoco Concreto Tri Shield to Protect Construction in India

Nuvoco Vistas Corp. Ltd., which is a leading construction...

JLG Acquires Canvas to Build Jobsite of the Future

JLG Industries, Inc., which is an Oshkosh Corporation business...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »