Close
WORLD OF CONCRETE
Friday, December 5, 2025
JEC WORLD 2026

MLH selects design and construction team for new Olive Branch hospital in US

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Leading GPS Time Tracking Apps for Construction Teams in the US (2026)

Introduction Construction teams often face challenges tracking labor hours across...

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...
- Advertisement -
Achema Middleeast

Methodist Le Bonheur Healthcare , an integrated health care delivery system, has finalized an integrated project delivery team for the design and construction of new Olive Branch hospital in the US.

The team includes Gresham, Smith and Partners , Smith Seckman Reid and Turner Construction Company. Located on the southeast corner of US Highway 78 and Bethel Road, the full-service, 100-bed hospital will support MLH’s dedication to sustainability.

The new hospital will reportedly support the facility’s mission of uniting with patients and their families in providing high quality, cost-effective patient and family-centred care.

Turner Construction Company will provide construction management services for the project and serve as general contractor. IPD requires the entire building team including the owner, architect, engineers, contractor and subcontractors through all phases of design and construction.

Smith Seckman Reid will be provide engineering design, medical communication system planning, commissioning and LEED facilitation services for the project. The facility is being designed to achieve the US Green Building Council Leadership in Energy and Environmental Design certification. Work on the project is set to commence on 19 October 2011.

Achema Middleeast

Latest stories

Related stories

Leading GPS Time Tracking Apps for Construction Teams in the US (2026)

Introduction Construction teams often face challenges tracking labor hours across...

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...

Who Offers the Best Shade Structures for Athletic Facilities? Here’s What You Should Know

The right shade structures for athletic facilities provide comfort,...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »