Close
WORLD OF CONCRETE
Thursday, December 25, 2025
JEC WORLD 2026

Linden Comansa designs disassembly device

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Cable Installation and Protection in Marine Applications

Electrical systems in marine environments face saltwater, moisture, vibration...

The UK Government Plans on a Single Construction Regulator

The UK government has announced its plans to establish...

What Are the Best Options for Emergency Power Equipment?

A sudden power outage on a construction site or...
- Advertisement -
Achema Middleeast

BGR Energy Systems, an energy plant engineering and construction company, is using two 18t 21CJ290 flat top tower cranes from Comansa Jie, Linden Comansa’s Chinese subsidiary, to build two cooling towers, in June.

To dismantle the crane within the tower, where mobile cranes could not reach, Linden Comansa designed a new dismantling device. The cooling towers have a diameter 142m and heights of 202m.

Both cranes were provided with a jib length of 74m to allow them to reach around the tower’s base.

The two 21CJ290 were assembled with rope anchors attaching them to the shell wall of the cooling towers for stability, Comansa Jie said.

To build at height of 202m BGR Energy Systems has jacked-up with a hydraulic cage in different phases to reach 217m of height.

The device disassembled the jib sections at this height, first decreasing the jib to 35m, shorter than the minimum diameter of the tower, allowing enough space for 21CJ290 to jack down the tower crane with the hydraulic cage.

Two tower cranes are carrying out construction on the Kalisindh Thermal Energy “super” plant built near the villages of Nimoda, Undal, Motipura, Singharia and Devri villages in Jhalawar district, Rajasthan.

Linden Comansa says that its 21LC290 flat top design is widely used in India, with seven 21CJ290s working on energy plants across the country.

BGR Energy System has another pair of 18t 21CJ290 at a Marwa plant, while another engineering firm, Larsen & Toubro is using two units at a Rajpura plant and one at a Talwandi Sabo plant.

Rajasthan Government is building the the Kalisindh Thermal Energy Plant to increase energy production by up to 1,200 Mw.

Achema Middleeast

Latest stories

Related stories

Cable Installation and Protection in Marine Applications

Electrical systems in marine environments face saltwater, moisture, vibration...

The UK Government Plans on a Single Construction Regulator

The UK government has announced its plans to establish...

What Are the Best Options for Emergency Power Equipment?

A sudden power outage on a construction site or...

Comparing Costs: How Much Do Remanufactured Transformers Cost Compared to New Ones?

The adoption of renewable energy, grid modernization and rapid...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »