Close
WORLD OF CONCRETE
Friday, December 5, 2025
JEC WORLD 2026

Hill International set to begin work on $280m zero-carbon R&D campus for Indian Oil

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Leading GPS Time Tracking Apps for Construction Teams in the US (2026)

Introduction Construction teams often face challenges tracking labor hours across...

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...
- Advertisement -
Achema Middleeast

US consultant Hill International has been awarded the design and construction management role on a $280m research campus for the Indian Oil Corp (IOC) in Faridabad on the outskirts of Delhi.

To demonstrate IOC’s turn away from hydrocarbons, the Technology Development and Deployment Centre will be surrounded by 14ha of solar panels, generating 16MW of electricity and making it the largest net-zero building of its type in the world.

The 24ha campus, complementing an existing facility set up in 1972 to research lubricants, will house four centres of excellence in alternative and renewable energy, nano-technology, synthetic biology and corrosion research.

Sanjiv Singh, the chairman of IOC, commented: “The centre is designed to achieve the highest sustainability rating of LEED Platinum certification and has been designed to be a net-zero campus in terms of energy and water use. Its power and water needs will be met through on-campus solar energy and water-harvesting systems.”

Said Mneimne, Hill’s senior vice president for Asia-Pacific, told GCR that Hill was regarded as the underdog in the race for the contract, for which US firms with bigger presences in India also bid.

Mneimne said that Hill usually required a month to mobilise, but this would be done almost immediately to meet the project’s “very tight” 28-month schedule. Hill will set up a joint design coordination office for contractor and engineering subconsultant, as well as IOC’s client team in order to streamline the design review process.

The construction contract was awarded on 18 March to Mumbai contractor Shapoorji Pallonji, which was in a two-horse race with Larsen & Toubro.

The masterplanning and design was carried out by Singaporean architect Ong & Ong, Los Angeles-based lab specialist Research Facilities Design and New Delhi architect Vyom. Hill partnered with these companies on the front-end engineering design for the centre.

The main architectural feature will be a “scoop” roof – a welded steel grid that will cover most of the campus’ buildings – as well as cantilevered floors.

Achema Middleeast

Latest stories

Related stories

Leading GPS Time Tracking Apps for Construction Teams in the US (2026)

Introduction Construction teams often face challenges tracking labor hours across...

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...

Who Offers the Best Shade Structures for Athletic Facilities? Here’s What You Should Know

The right shade structures for athletic facilities provide comfort,...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »