Close
WORLD OF CONCRETE
Sunday, November 30, 2025
JEC WORLD 2026

First contract awarded for £150m Lanarkshire wind farms

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...

Who Offers the Best Shade Structures for Athletic Facilities? Here’s What You Should Know

The right shade structures for athletic facilities provide comfort,...
- Advertisement -

Hochtief chosen for Broughton BypassVan Oord signs $500m Caspian Sea dealSamsung C&T wins Singapore station and tunnel contractBechtel team lands first stage of $1.8bn Canadian light rail schemeAlstom signs €3.7bn of Indian light rail deals

Consulting engineer Grontmij has been appointed to oversee site investigation work at two Lanarkshire wind farms.

The Dutch firm, which was acquired by Sweden’s Sweco earlier this year, has been commissioned by Banks Renewables to oversee pre-construction work at both Middle Muir and Kype Muir wind farms. It will provide data analysis to provide information for the civil engineers to be able to plan the installation of the wind turbines and electricity sub-stations.

Grontmij’s Glasgow office will interpret data gathered by Hamilton-based Raeburn Drilling & Geotechnical.

The combined construction costs of both sites are expected to reach £150m.

Grontmij senior renewables engineer Kathryn Sanders said: “Grontmij have supported Banks with our geotechnical and civil engineering expertise on many wind farm projects. It continues to be great to work alongside them from the start, particularly as they pay attention during the development of their projects and are willing to adapt to accommodate local concerns.”

Kype Muir Wind Farm, south of Strathaven, is a 26-turbine 104MW wind farm and was approved in May 2014. Middle Muir Wind Farm, north of Crawfordjohn, is a 15-turbine 51MW project that is set to deliver the tallest onshore turbines on mainland UK. It was approced in September 2014.

Banks development director Colin Anderson said: “These projects have taken years of careful planning and consideration – so it is a major milestone to see them reach this stage in the journey. Despite not being able to award this particular contract to a small local firm, Grontmij have been very understanding of our commitments and as a result have ensured that local firms are subcontracted wherever possible, maximising the benefit to the region.”

Latest stories

Related stories

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...

Who Offers the Best Shade Structures for Athletic Facilities? Here’s What You Should Know

The right shade structures for athletic facilities provide comfort,...

How Advanced Aluminum Design Is Shaping the Future of Modern Construction

Modern construction is moving forward at a remarkable pace....

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »