Close
MCE 2026
Wednesday, March 4, 2026
JEC WORLD 2026

Reading railway station redevelopment reaches bridge slide

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Siemens Unveils Human-Centric Autonomous Buildings Strategy

Siemens is using Light + Building 2026 in Frankfurt,...

Digital Construction Equipment and Site Automation

The integration of IoT sensors and advanced fleet management software is revolutionizing project sites, where digital construction equipment and automated systems streamline workflows, enhance asset tracking, and maximize operational uptime.

Modular Raised Flooring Systems in Smart Buildings

Modern commercial infrastructure is increasingly reliant on the adaptability provided by modular raised flooring systems. By creating a versatile plenum for cable management and climate control, these structural panels enable smart buildings to evolve with changing technology while optimizing workspace efficiency and occupant comfort.
- Advertisement -

Construction work on the Reading railway station has reached the stage of a major bridge slide across the rail tracks.

The new 100m deck is being constructed in three sections at a site beside the tracks. The new deck will be much bigger than the old structure and have escalators to platforms, as reported by The Construction Index.

The first 50m section was pushed 28m out over the railway. The second section is due to be built and launched over the railway by the end of August 2012, leaving the third section to be erected in position.

The weight of the first section jacked in July is around 729 tons. The bridge slide was carried out by bridge jacking specialists Dorman Long Technology. The new transfer deck is due to open at the end of March 2013.

Achema Middleeast

Latest stories

Related stories

Siemens Unveils Human-Centric Autonomous Buildings Strategy

Siemens is using Light + Building 2026 in Frankfurt,...

Digital Construction Equipment and Site Automation

The integration of IoT sensors and advanced fleet management software is revolutionizing project sites, where digital construction equipment and automated systems streamline workflows, enhance asset tracking, and maximize operational uptime.

Modular Raised Flooring Systems in Smart Buildings

Modern commercial infrastructure is increasingly reliant on the adaptability provided by modular raised flooring systems. By creating a versatile plenum for cable management and climate control, these structural panels enable smart buildings to evolve with changing technology while optimizing workspace efficiency and occupant comfort.

Resilient Flooring Solutions for Urban Infrastructure

As cities grow and transit networks expand, the demand for durable and responsive surfacing has never been higher. Resilient flooring solutions are bridging the gap between heavy-duty engineering and human comfort, providing impact-resistant and acoustically optimized surfaces that define the modern urban experience in metro stations, airports, and public plazas.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »