Close
ALUMINIUM CHINA2026
Tuesday, April 21, 2026
R+T Asia 2026

Reading railway station redevelopment reaches bridge slide

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Infrastructure Development Trends Reshaping Global Cities

The evolution of metropolitan living is increasingly defined by sophisticated transportation networks and resilient utility systems that prioritize environmental sustainability and technological connectivity for a growing urban population.

Heavy Construction Equipment Trends Boosting Productivity

The rapid advancement of mechanical engineering and digital integration is redefining the capabilities of heavy machinery, leading to significant gains in operational output and precision on complex work sites.

Advanced Building Materials Driving Modern Construction

Innovative developments in structural components are redefining the durability and environmental footprint of new infrastructure, as researchers create substances that can repair themselves and capture carbon directly from the atmosphere.
- Advertisement -

Construction work on the Reading railway station has reached the stage of a major bridge slide across the rail tracks.

The new 100m deck is being constructed in three sections at a site beside the tracks. The new deck will be much bigger than the old structure and have escalators to platforms, as reported by The Construction Index.

The first 50m section was pushed 28m out over the railway. The second section is due to be built and launched over the railway by the end of August 2012, leaving the third section to be erected in position.

The weight of the first section jacked in July is around 729 tons. The bridge slide was carried out by bridge jacking specialists Dorman Long Technology. The new transfer deck is due to open at the end of March 2013.

Achema Middleeast

Latest stories

Related stories

Infrastructure Development Trends Reshaping Global Cities

The evolution of metropolitan living is increasingly defined by sophisticated transportation networks and resilient utility systems that prioritize environmental sustainability and technological connectivity for a growing urban population.

Heavy Construction Equipment Trends Boosting Productivity

The rapid advancement of mechanical engineering and digital integration is redefining the capabilities of heavy machinery, leading to significant gains in operational output and precision on complex work sites.

Advanced Building Materials Driving Modern Construction

Innovative developments in structural components are redefining the durability and environmental footprint of new infrastructure, as researchers create substances that can repair themselves and capture carbon directly from the atmosphere.

Low-Carbon Construction Materials for Sustainable Infrastructure

Transitioning to low-carbon building materials represents a pivotal shift in modern engineering, enabling the development of resilient and environmentally responsible infrastructure by significantly lowering the embodied carbon of large-scale projects.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »