Close
WORLD OF CONCRETE
Monday, October 13, 2025
ACHEMA MIDDLE EAST

CSC submits plans for £180m Lakeside expansion

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Future of Architectural Lighting with Smart Tech

The Future of Architectural Lighting – How Smart Lighting...

Human-Centric Lighting for Workplaces and Homes

Human-Centric Lighting: Enhancing Wellbeing in Workplaces and Homes The recognition...

Role of Lighting in Interior Design and Spaces

Lighting in Interior Design – Creating Mood, Functionality, and...

Biophilic Lighting Design Connecting Nature Indoors

The Rise of Biophilic Design – How Lighting Connects...
- Advertisement -

Capital Shopping Centres has submitted a planning application for a 325,000-sq ft extension to Lakeside.

The extension at the northern end of the centre will increase the size of Lakeside by nearly a third. This will incorporate up to 40 new stores alongside the recent flagship TopShop/TopMan which opened last month and the new Forever 21 store which will open at Lakeside at the end of next year.

The works will also include an improved transport infrastructure comprising a new bus station linked to Chafford Hundred rail station and provision for a link road to the north of the centre. There will also be a new landscaped external street and public square.

The application follows months of public consultation which saw the planned expansion backed by 88 per cent of those who provided views at a recent public exhibition in the centre and online.

Jonathan Ainsley, director of asset management (south) at CSC said: “Lakeside, which celebrated its 21st anniversary this year, continues to be high on retailers’ wishlists as evidenced by the recent Arcadia and Forever 21 deals and the planned extension enables us to accommodate bigger and better stores for many more retailers too. We aim to continually evolve and invest in our centres to ensure we are offering the best experience for our shoppers as we can.”

If the plans, which have been submitted in an outline application to Thurrock Thames Gateway Development Council, receive planning consent, construction could begin onsite as early as 2013 with the full scheme fully open in 2016.

Latest stories

Related stories

Future of Architectural Lighting with Smart Tech

The Future of Architectural Lighting – How Smart Lighting...

Human-Centric Lighting for Workplaces and Homes

Human-Centric Lighting: Enhancing Wellbeing in Workplaces and Homes The recognition...

Role of Lighting in Interior Design and Spaces

Lighting in Interior Design – Creating Mood, Functionality, and...

Biophilic Lighting Design Connecting Nature Indoors

The Rise of Biophilic Design – How Lighting Connects...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »