Close
Super Terminal Expo 2026
Thursday, July 23, 2026
LiGHT26

Salini Impregilo Group wins $524M Caloosahatchee Reservoir contract in Florida

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

McLaren Construction Appointed for YORbuild Framework

The division of Yorkshire and North East has been...

Department of Transportation Allocates $1.73 Billion for 127 Construction Projects

United States Department of Transportation (DOT) Secretary Sean P....

The LEEA logo – looking after the badge of excellence

The LEEA logo is a mark of best practice...
- Advertisement -

Lane of Salini Impregilo Group has won a $524-million contract to build the Caloosahatchee (C43) West Basin Storage Reservoir in southern Florida, strengthening its presence in the United States where news orders represented 50% of the Groupโ€™s total in 2018, resulting in a 35% increase for a record construction backlog.

Commissioned by the South Florida Water Management District as part of the Comprehensive Everglades Restoration Plan, the contract is to reduce harmful discharges into the Caloosahatchee Estuary in Hendry County by 2024. It includes the construction of an earth-fill dam with a perimetre of about 16.3 miles (26.2 kilometres) and a separator dam of 2.8 miles (4.5 kilometres) in length. The reservoir will encompass about 10,000 acres (40.5 square kilometres) and store 170,000 acre-feet (209.7 million cubic metres) of water when full. When it rains, the reservoir will capture water run-offs contaminated by residential and agricultural developments in the area. During dry periods, it will maintain a desirable minimum flow of fresh water to the estuary, reducing extreme salinity changes.

Lane is applying their expertise in other projects to protect lakes and rivers in the United States. In Tennessee, it is upgrading a wastewater treatment plant, while in Georgia, it is expanding a water reclamation facility and improving a water resources facility.

Along with Salini Impregilo, Lane is also working on major hydraulic tunnelling projects to help cities better handle combined sewer overflows during rainstorms and reduce the pollution of their rivers and lakes. There is the Three Rivers Protection & Overflow Reduction Tunnel (3RPORT) in Ft. Wayne, Indiana; the Dugway Storage Tunnel in Cleveland, Ohio; and the Anacostia River Tunnel, which along with the Northeast Boundary Tunnel (NEBT) in Washington, D.C., belongs to the cityโ€™s major Clean Rivers Project.

World Construction Today brings together the global construction industry โ€” from contractors and developers to engineers and project owners โ€” through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium construction industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global construction and infrastructure value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

McLaren Construction Appointed for YORbuild Framework

The division of Yorkshire and North East has been...

Department of Transportation Allocates $1.73 Billion for 127 Construction Projects

United States Department of Transportation (DOT) Secretary Sean P....

The LEEA logo – looking after the badge of excellence

The LEEA logo is a mark of best practice...

Construction Logistics Optimization Reducing Project Delays

Enhancing the flow of materials and resources from production to the job site is a fundamental driver of project efficiency and schedule adherence. By implementing advanced planning, real-time tracking, and integrated supply chain management, organizations can eliminate bottlenecks and minimize the costly interruptions that frequently plague large-scale developments. This strategic focus on logistics ensures that every component is delivered with precision, fostering a more predictable and productive construction environment that benefits all stakeholders involved.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป