Close
ALUMINIUM CHINA2026
Thursday, June 25, 2026
LiGHT26

Skanska invests EUR 96M to build ECHA (European Chemical Agency) in Helsinki, Finland

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

USG Expands Canadian Capacity with Alberta Wallboard Plant

USG Corporation has strengthened the supply of construction materials...

IGBC Green Hospitality Summit Backs Net-Zero Infrastructure

The IGBC Green Hospitality Summit 2026 brought together key...

LEEA Introduces Proficiency Testing

LEEA (Lifting Equipment Engineers Association) is rolling out a...
- Advertisement -

Skanska invests EUR 96 M, about SEK 960 M, in an office project in Helsinki, Finland. The building will be the office for the European Chemicals Agency, ECHA, who signed the lease agreement in December 2017.

The investment will be recorded in the first quarter of 2018. The construction contract is worth EUR 86 M, about SEK 860 M, and will be included in the order booking for the first quarter of 2018.

ย The eight store office building will be built at a central location in the Telakkaranta area in Helsinki. The area is one of the very last old industrial sites in downtown Helsinki and the project will include elements of the history of the site. A listed building, an old red-brick woodwork shop, will be part of the new building.

Also, an old foundry building located next to the ECHA building will be entirely renovated into a conference and events center. The entire area will be transformed in to a modern hub that will also include residential and other premises.

ย 

In total the EHCA building complex will comprise about 17,500 square meters of leasable space. Work has already started, and construction of the new premises is expected to be completed in the end of 2019.

World Construction Today brings together the global construction industry โ€” from contractors and developers to engineers and project owners โ€” through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium construction industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global construction and infrastructure value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

USG Expands Canadian Capacity with Alberta Wallboard Plant

USG Corporation has strengthened the supply of construction materials...

IGBC Green Hospitality Summit Backs Net-Zero Infrastructure

The IGBC Green Hospitality Summit 2026 brought together key...

LEEA Introduces Proficiency Testing

LEEA (Lifting Equipment Engineers Association) is rolling out a...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป