Close
WORLD OF CONCRETE
Friday, December 5, 2025
JEC WORLD 2026

Balfour Beatty wins $123 million student accommodation project in London

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Leading GPS Time Tracking Apps for Construction Teams in the US (2026)

Introduction Construction teams often face challenges tracking labor hours across...

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...
- Advertisement -
Achema Middleeast

UK-based Balfour Beatty Plc has secured a contract to deliver a £80 million ($122.8 million) student accommodation project for the London-based student accommodation supplier Urbanest in central London, UK.

Designed by UK-based architect Allford Hall Monaghan Morris (AHMM), the proposed student accommodation project will be located on Westminster Bridge Road, in close proximity to the South Bank Conservation Area and the Westminster World Heritage site.

The building will be 19-storey tall and will feature 1,092 bedrooms. The development will also include a new sixth-form college, a health suite with swimming pool, affordable office space, a school, cafe and landscaped garden.

The building will have a curved form, with attractive white banding and recessed glazing to enable it to blend with the surrounding street scene and public realm. The project has been designed to achieve a BREEAM ‘Excellent’ rating, and to achieve this, the project will incorporate a host of sustainable elements, such as photovoltaic panels and combined heat and power technology.

The building will be developed using modular off site construction techniques for bathroom pods and a cladding system, which will foster faster and safer construction. The construction of the building is scheduled to get underway in mid-2013and will be completed in time for the beginning of the 2015 academic year.

Achema Middleeast

Latest stories

Related stories

Leading GPS Time Tracking Apps for Construction Teams in the US (2026)

Introduction Construction teams often face challenges tracking labor hours across...

9 Essential Steps to Prepare Your Home for Winter 2025

Winter has a way of exposing every weak spot...

New Clay-Based Material Created as a Substitute to Concrete

Researchers at Oregon State University have gone ahead and...

Who Offers the Best Shade Structures for Athletic Facilities? Here’s What You Should Know

The right shade structures for athletic facilities provide comfort,...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »