Close
WORLD OF CONCRETE
Wednesday, October 29, 2025
Liftex 2025

APM break ground on $47 million mixed-use scheme in Pennsylvania

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Where Can I Buy ADA-Compliant Playground Surfacing? 7 Options

Safe play environments are essential for children of all...

From Toolbox Talk to Wallet Card: A 3-Step Forklift-Safety Program Any GC Can Deploy This Week

Jobsite delays rarely come from a lack of hustle—they...

Construction Essentials: What Are the Most Common Types of Heavy Equipment Used?

Heavy construction equipment is a critical asset, as it...

Why Every Industry Needs Safety T-Shirts for Worker Protection

Worker safety is a top priority across all industries....
- Advertisement -

Asociacion de Puertorriquenos en Marcha (APM), in association with co-developer Jonathan Rose Companies, has broken ground on $47.2 million Paseo Verde in Philadelphia, Pennsylvania.

The Paseo Verde project will be developed in close proximity to Temple University Regional Rail Station. Scope of the project involves construction of 120 residential units (which will be a mix of affordable and workforce housing) and 30,000 square feet of commercial and retail space. Construction will be done in strict compliance with environmental principles. The building will feature both green and blue roofs. The project will have permeable paving to prevent wastage of rain water. Paseo Verde will meet some of its power requirements by means of green power generated on-site by solar panels. Additional green features include water gardens, and usage of recyclable and renewable materials. The material used in the development will prevent environmentally triggered health conditions. The scheme is targeted for both LEED for Homes and LEED for Neighborhood Development certifications. Construction is scheduled for completion in the first quarter of 2013. The developers have secured $520,423 from the Federal Home Loan Bank of San Francisco under the provision of its Affordable Housing Program (AHP). The grant was financed through Bank member JPMorgan Bank & Trust Company.

 

Latest stories

Related stories

Where Can I Buy ADA-Compliant Playground Surfacing? 7 Options

Safe play environments are essential for children of all...

From Toolbox Talk to Wallet Card: A 3-Step Forklift-Safety Program Any GC Can Deploy This Week

Jobsite delays rarely come from a lack of hustle—they...

Construction Essentials: What Are the Most Common Types of Heavy Equipment Used?

Heavy construction equipment is a critical asset, as it...

Why Every Industry Needs Safety T-Shirts for Worker Protection

Worker safety is a top priority across all industries....

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »