Close
Wednesday, June 18, 2025

Toyota to build compressor manufacturing plant in Indonesia

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Transforming Construction Planning with Geospatial Intelligence

If you've worked in construction, you've probably run into...

Which of These 5 Temporary Power Options Fits the Needs of Your Job Site?

Every job site needs dependable power to function safely...

8 Overlooked Tools That Save Time (And Your Back) on the Jobsite

Construction projects always take time, but they do not...

Arizona Construction Challenges: Heat, Monsoons, and Solutions

Arizona’s rapid growth in both population and development brings...

Japan-based Toyota Industries Corporation has announced that it will construct a new factory to produce automotive air-conditioning compressors at Bekasi, West Java Province, Indonesia.

According to Toyota, the facility will be built as a new plant for the compressor-manufacturing subsidiary P.T. TD Automotive Compressor Indonesia (TACI). The new facility has a site area of about 100,000 square metres and factory area of approximately 28,000 square metres.

The new facility will be constructed with an investment capital of IDR747 billion ($76.9 million). Scheduled to begin operation in May 2014, the facility will create 500 new jobs in the region.

Currently, TACI has an annual production capacity of 1.6 million units at its existing facility. It primarily supplies compressors to the ASEAN market focusing on Indonesia and Thailand.

To meet increasing demand within the ASEAN region and other non-ASEAN countries, TACI intends to relocate production in stages from its present factory to the new factory and to boost its annual production capacity to three million units.

Latest stories

Related stories

Transforming Construction Planning with Geospatial Intelligence

If you've worked in construction, you've probably run into...

Which of These 5 Temporary Power Options Fits the Needs of Your Job Site?

Every job site needs dependable power to function safely...

8 Overlooked Tools That Save Time (And Your Back) on the Jobsite

Construction projects always take time, but they do not...

Arizona Construction Challenges: Heat, Monsoons, and Solutions

Arizona’s rapid growth in both population and development brings...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back