Close
MCE 2026
Friday, January 9, 2026
JEC WORLD 2026

Mansell begins work on $7 million Exeter education project in UK

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...

Getting Field Workers to Actually Use Time Tracking Systems: What Works

Time tracking technology fails in construction for one simple...

The ROI of Getting Submittals Right the First Time

Every construction project manager knows the drill: submit, reject,...
- Advertisement -
Advancing Prefabrication 2026

UK-based Mansell Construction Services Limited has commenced construction work on £4.7 million ($7.2 million) Engineering and Automotive Centre for Exeter College in Devon, UK. The new centre will offer industry-led teaching space, workshops and laboratories for both practical and academic learning students from across Exeter and Devon.The students will be studying a wide range of courses, ranging from part-time introductory courses for 14-16 year olds in partnership with local schools to 16-18 year old full-time students on levels 1-3 vocational courses.

Apprentices will also train at the brand new Technology Centre whilst working in a range of local and regional businesses, university-level courses and dedicated employer training. The facility will house technical workshops and classrooms including an MOT testing bay, garage workshop area for the repair, maintenance and servicing of motor vehicles and motorcycles. A CADCAM Engineering IT suite, diagnostic testing labs and a three-storey learning and IT centre will complete the centre. The project, procured through Construction South West Framework, is scheduled to be completed in mid-2012.

Advancing Prefabrication 2026

Latest stories

Related stories

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...

Getting Field Workers to Actually Use Time Tracking Systems: What Works

Time tracking technology fails in construction for one simple...

The ROI of Getting Submittals Right the First Time

Every construction project manager knows the drill: submit, reject,...

How Waterjet Cutting Technology Is Transforming Prefabricated Building Components

Introduction Waterjet cutting technology is a manufacturing process that uses...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »