Close
Wednesday, June 11, 2025

Arup completes engineering works for University of Chicago Laboratory School

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

5 Creative Ways Businesses Are Reusing FIBC Bulk Bags (and Saving Money)

When you're managing a warehouse, manufacturing line, or distribution...

How Construction Trends Are Driving a New Wave of Real Estate Investment

Real estate has always danced to the rhythm of...

What Are the Top Options for Sustainable Blasting Materials?

Blasting is critical in various industrial applications, from automotive...

The Ultimate Guide to Excavator Attachments For Transforming Your Construction Business

Table of Contents: Introduction The Untapped Potential of Excavator Attachments How Excavator...

Arup has completed the design and coordination of mechanical, plumbing, and fire protection services (MP/FP) for the Earl Shapiro Hall at the Laboratory Schools Early Childhood Campus in the US.

The 117,000 square foot school facility, which is associated with the University of Chicago, accommodates nursery, kindergarten, and first- and second-grade students from across the city.

Arup worked with executive architect FGM Architects, and design architect Valerio Dewalt Train Associates to determine the functional needs of the facility in the framework of energy efficiency and natural light.

The company engineered a radiant floor system to off-set heat loss and provides regulatory comfort for the children and staff.

Modular multi-stack chillers and condensing boilers were selected for the facility’s central plant.

Arup said providing isolation valves at the modular chillers allows both the chilled water and condensed water systems to operate variable flow, resulting in significant reductions in consumption.

Earl Shapiro Hall, which was opened in the fall of 2013, is targeting LEED Silver certification.

Latest stories

Related stories

5 Creative Ways Businesses Are Reusing FIBC Bulk Bags (and Saving Money)

When you're managing a warehouse, manufacturing line, or distribution...

How Construction Trends Are Driving a New Wave of Real Estate Investment

Real estate has always danced to the rhythm of...

What Are the Top Options for Sustainable Blasting Materials?

Blasting is critical in various industrial applications, from automotive...

The Ultimate Guide to Excavator Attachments For Transforming Your Construction Business

Table of Contents: Introduction The Untapped Potential of Excavator Attachments How Excavator...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back