Close
World of Concrete
Thursday, November 5, 2026
AHR Expo 2027

News

Amazon Sets New Standards with Stockton-on-Tees Low-Carbon Facility

Amazon has officially opened its latest low-carbon delivery station in Stockton-on-Tees, UK, a facility designed to establish new benchmarks for sustainable industrial construction in Europe. The 10,800mยฒ logistics building opened on October 21 and serves as a testing ground...

GS Engineering Develops 20 Steel Modular Building Designs

GS Engineering & Construction has developed 20 standard floor plans for steel modular buildings covering apartments, officetels, hotels and dormitories. The company will integrate the designs with a building information modeling (BIM)-based construction cost estimation system, enabling customers to...

Why Engine Identification Matters in Compact Equipment Repairs

For workshops sourcing Yanmar engine parts or Kubota engine parts, the most useful detail is often the engine reference rather than the name on the machine. A compact excavator or loader can arrive for repair with a familiar equipment...

Swiss Steel and Canada Nickel’s Low Carbon Steel Partnership

Swiss Steel Group and Canada Nickel Company have announced plans to establish a long-term strategic low carbon steel partnership to supply semi-finished steel products from Canada, with potential deliveries of approximately one million tonnes annually from 2030. The companies signed...

Building for Resilience Means Building for What Happens When the Grid Goes Down

When a hurricane, wildfire or winter storm takes down the grid, your automated heating, ventilation and air conditioning (HVAC), refrigeration and security systems stop the moment their power source fails. As you add more high-draw devices to your facility,...

The Grid Can’t Wait: How Utilities Are Solving the Transformer Lead-Time Crisis

Electric utilities cannot wait two years for new transformers. Global demand has created a massive backlog, and manufacturing capacity simply isn't keeping up with grid modernization needs. Rental transformers have become the go-to solution, giving operators immediate access to...

Subiaco Wastewater Upgrade Advances Infrastructure Capacity for Perth Development

The Western Australian government has committed an initial AU$105 million to upgrade the Subiaco Water Resource Recovery Facility in Shenton Park, Perth, advancing engineering and design work on infrastructure intended to support future residential and urban development. The project...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Must read

Translate ยป