Close
WORLD OF CONCRETE
Tuesday, December 16, 2025
JEC WORLD 2026

Business & Industry

Intelligent Coordination Workflows Linking Designers, Fabricators, and Installers

Key Takeaways Integrated BIM environments detect design conflicts before fabrication, reducing costly rework and manufacturing errors Real-time coordination workflows enable simultaneous work by multiple disciplines, compressing design timelines by 25-35% Automated approval routing accelerates decision-making processes, eliminating delays from...

Data-Driven Design Systems Enabling Faster and More Accurate Prefab Engineering

Key Takeaways Parametric design tools reduce engineering time by 40-50% through automation of complex calculations and iterative processes Data-driven design systems enable accurate material forecasting, reducing waste and improving cost predictability Algorithmic optimization improves module geometries, enhancing structural efficiency...

The Emergence of Hybrid Construction Models Combining Onsite and Offsite Excellence

Construction’s evolution reveals itself through emerging hybrid approaches representing thoughtful compromises between competing objectives. Purely modular construction prioritizes speed through maximum prefabrication, sometimes sacrificing architectural flexibility and design distinctiveness. Purely traditional construction maximizes design freedom but sacrifices speed, cost...

Rethinking Construction Productivity Through Industrial Manufacturing Principles

Key Takeaways Takt time planning aligns construction workflow rhythms with demand, eliminating overproduction and streamlining labor flow Lean construction principles reduce waste by up to 40%, improving project profitability and timeline predictability Assembly line sequencing of construction trades prevents...

Standardized Building Platforms Becoming the Blueprint for High-Volume Construction

Key Takeaways Standardized building platforms enable high-volume construction at scale while maintaining design consistency Kit-of-parts systems reduce engineering time by 40-50% compared to custom design processes Platformization streamlines procurement through predefined, interoperable components reducing supply chain complexity Standardized components...

How Scalable Prefabrication is Reshaping Large Infrastructure Projects

Key Takeaways Prefabricated bridge elements reduce construction timelines by 40-50% compared to cast-in-place methods Factory-controlled manufacturing ensures consistent quality with reduced defect rates in critical infrastructure components PBES eliminates weather delays and enables night or weekend installations, minimizing traffic...

The Global Shift Toward Factory-First Construction Models

Key Takeaways Factory-first construction reduces project timelines by more than a third while improving quality control Offsite manufacturing delivers up to 10% cost savings through controlled environments and streamlined processes Standardized production methods minimize defect rates to below 5%,...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Must read

Translate »