Close
MCE 2026
Saturday, March 14, 2026
2026 Mining Türkiye Exhibitor List

Davyhulme remediation role for O’Connor

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Komatsu Unveils Next-Generation Bulldozers at Conexpo 2026

Komatsu has announced the introduction of its next-generation bulldozers,...

John Holland Selects Ivalua for Construction Procurement

Construction and infrastructure company John Holland has selected Ivalua’s...

UK Launches Circular Construction Hub in London Royal Docks

The UK’s first Circular Construction Hub has launched in...
- Advertisement -

PP O’Connor has been appointed by Celtic Technologies to carry out the bulk earthworks, remediation and ground stabilisation required for the enabling works on the £170m Davyhulme wastewater treatment plant upgrade. The remediation work to a site west of junction 10 of the M60 motorway in Trafford forms part of the larger site redevelopment to be undertaken Laing O’Rourke and Imtech (LORI) for United Utilities. [See our previous report here.

Celtic-Englobe was awarded the £5.5m enabling works package in March.

PP O’Connor’s role is to manage the asbestos risk and segregate soils that are geo-technically and chemically suitable for use without further treatment. It will treat otherwise unsuitable soils or other excavated materials to render them acceptable for reuse on site. All technical assistance, pre and post validation testing, monitoring, statutory licencing and gaining of permits etc will be undertaken by Celtic Technologies.

The main focus of the enabling works is to excavate, sort and remediate historic screenings and varied made ground, sludges and other arisings previously tipped from historical developments. Some soils may be treated by stabilisation. It is anticipated that some concrete/brick rubble will also be excavated as part of enabling works and some of these arisings will require crushing before they can be re-used within the works. T

he works generally involve sorting, processing and re-engineering in the region of 250,000m3 of the existing topography to provide three engineered piling platforms and an early surcharge mound in the region of 100,000m3 of processed material to ensure proper settlement of deep silts located in the area of an old river bed.

In conjunction with the earthworks, Celtic will also be carrying out additional works relating to the removal of several redundant deep digester tanks and the potential treatment of any resultant sludges. Finally, piling platforms are to be stabilised and imported aggregate piling mats placed prior to final handover for the actual construction works.

The Davyhulme treatment plant is the largest in the northwest and serves a population of more than a million people. The upgrade is expected to improve the quality of water entering the Manchester Ship Canal and take 36 months to complete.

Achema Middleeast

Latest stories

Related stories

Komatsu Unveils Next-Generation Bulldozers at Conexpo 2026

Komatsu has announced the introduction of its next-generation bulldozers,...

John Holland Selects Ivalua for Construction Procurement

Construction and infrastructure company John Holland has selected Ivalua’s...

UK Launches Circular Construction Hub in London Royal Docks

The UK’s first Circular Construction Hub has launched in...

UK Infrastructure Pipeline Outlines £718B Investment Demand

Investors and construction firms now have access to a...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »