Close
ALUMINIUM CHINA2026
Wednesday, April 22, 2026
R+T Asia 2026

Saudi National Contracting Company to build power transmission line in Oman

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

7 Mistakes to Avoid When Managing Security on Your Jobsite

Construction sites are common targets for criminals. They contain...

Gammon Deploys Low-Carbon Concrete in Hong Kong Project

A sustainability-focused construction approach is being implemented in Hong...

What Are the Top-Rated Heavy Equipment Rental Companies? These 5 Are Currently Leading in the U.S.

In construction and similar sectors, renting heavy equipment can...
- Advertisement -

Saudi National Contracting Company to build power transmission line in Oman.

The transmission line will be built simultaneously with the governorate’s first natural gas-based power plant, which is currently the subject of a competitive tender.

The electricity from the power plant, which is expected to be sized at around 120MW, will be supplied to towns and villages in Dibba and Khasab, supplanting diesel-based electrical generation for the first time in the governorate.

The 132kV overhead transmission line will start at Tibat in Wilayat Bukha, where the power plant is proposed to be located. It will travel around 18km to Khasab and extend a further 80km all the way to Dibba. As part of the project, 132kV grid stations will be built at Tibat, Khasab and Dibba. The Musandam power transmission project is set to be completed in two years.

The natural gas as fuel for the power plant at Tibat will be supplied from a new integrated oil and gas processing plant (also known as the Musandam Gas Plant) currently under development by Oman Oil’s upstream subsidiary, Oman Oil Company Exploration and Production (OOCEP).

OOCEP is investing around $600 million in an integrated processing plant with a capacity to treat 45 million standard cubic feet per day of gas and 20,000 barrels per day of crude oil. Hyundai is building the gas plant on an EPC contract.

Achema Middleeast

Latest stories

Related stories

7 Mistakes to Avoid When Managing Security on Your Jobsite

Construction sites are common targets for criminals. They contain...

Gammon Deploys Low-Carbon Concrete in Hong Kong Project

A sustainability-focused construction approach is being implemented in Hong...

What Are the Top-Rated Heavy Equipment Rental Companies? These 5 Are Currently Leading in the U.S.

In construction and similar sectors, renting heavy equipment can...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »