Close
World of Concrete
Friday, October 30, 2026
AHR Expo 2027

Linden Comansa designs disassembly device

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

Swiss Steel and Canada Nickel’s Low Carbon Steel Partnership

Swiss Steel Group and Canada Nickel Company have announced...

Building for Resilience Means Building for What Happens When the Grid Goes Down

When a hurricane, wildfire or winter storm takes down...

The Grid Can’t Wait: How Utilities Are Solving the Transformer Lead-Time Crisis

Electric utilities cannot wait two years for new transformers....
- Advertisement -
Super Terminal Expo 2026

BGR Energy Systems, an energy plant engineering and construction company, is using two 18t 21CJ290 flat top tower cranes from Comansa Jie, Linden Comansa’s Chinese subsidiary, to build two cooling towers, in June.

To dismantle the crane within the tower, where mobile cranes could not reach, Linden Comansa designed a new dismantling device. The cooling towers have a diameter 142m and heights of 202m.

Both cranes were provided with a jib length of 74m to allow them to reach around the tower’s base.

The two 21CJ290 were assembled with rope anchors attaching them to the shell wall of the cooling towers for stability, Comansa Jie said.

To build at height of 202m BGR Energy Systems has jacked-up with a hydraulic cage in different phases to reach 217m of height.

The device disassembled the jib sections at this height, first decreasing the jib to 35m, shorter than the minimum diameter of the tower, allowing enough space for 21CJ290 to jack down the tower crane with the hydraulic cage.

Two tower cranes are carrying out construction on the Kalisindh Thermal Energy “super” plant built near the villages of Nimoda, Undal, Motipura, Singharia and Devri villages in Jhalawar district, Rajasthan.

Linden Comansa says that its 21LC290 flat top design is widely used in India, with seven 21CJ290s working on energy plants across the country.

BGR Energy System has another pair of 18t 21CJ290 at a Marwa plant, while another engineering firm, Larsen & Toubro is using two units at a Rajpura plant and one at a Talwandi Sabo plant.

Rajasthan Government is building the the Kalisindh Thermal Energy Plant to increase energy production by up to 1,200 Mw.

Never miss a packaging headline

The packaging industry moves fast – stay on top of it with our must - read briefings.

  • The top packaging and consumer goods stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments reshaping global packaging markets

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Latest stories

Related stories

Swiss Steel and Canada Nickel’s Low Carbon Steel Partnership

Swiss Steel Group and Canada Nickel Company have announced...

Building for Resilience Means Building for What Happens When the Grid Goes Down

When a hurricane, wildfire or winter storm takes down...

The Grid Can’t Wait: How Utilities Are Solving the Transformer Lead-Time Crisis

Electric utilities cannot wait two years for new transformers....

Subiaco Wastewater Upgrade Advances Infrastructure Capacity for Perth Development

The Western Australian government has committed an initial AU$105...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »