Close
MCE 2026
Friday, January 9, 2026
JEC WORLD 2026

DTE, Enbridge and Spectra to develop Nexus Gas Transmission system

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...

Getting Field Workers to Actually Use Time Tracking Systems: What Works

Time tracking technology fails in construction for one simple...

The ROI of Getting Submittals Right the First Time

Every construction project manager knows the drill: submit, reject,...
- Advertisement -
Advancing Prefabrication 2026

DTE Energy (DTE), Enbridge Inc. (ENB) and Spectra Energy Corp (SE) have signed a memorandum of understanding (MoU) to jointly develop the Nexus Gas Transmission (NGT) system.

NGT system is a pipeline to connect natural gas from Ohio’s Utica Shale fields to markets in the US Midwest and Ontario. It would originate in northeastern Ohio and stretch 250 miles long and be capable of transporting one billion cubic feet of natural gas per day.

The line will follow existing utility corridors to an interconnect in Michigan and utilize the existing Vector Pipeline system to reach the Ontario market. Upon completion of the project, Spectra Energy will become a 20% owner in Vector Pipeline, a joint venture between DTE Energy and Enbridge.

The new pipeline will serve local distribution companies, power generators and industrial users in the Ohio, Michigan and Ontario markets. It will include interconnects with Michigan Consolidated Gas Company, Consumers Energy and, through the Vector Pipeline, the Enbridge Tecumseh Gas Storage facility and Union Gas’ Dawn Hub, both in Ontario.

Advancing Prefabrication 2026

Latest stories

Related stories

3 Top Security Solutions for Harsh Weather Environments

Harsh weather conditions are detrimental to the integrity of...

Getting Field Workers to Actually Use Time Tracking Systems: What Works

Time tracking technology fails in construction for one simple...

The ROI of Getting Submittals Right the First Time

Every construction project manager knows the drill: submit, reject,...

How Waterjet Cutting Technology Is Transforming Prefabricated Building Components

Introduction Waterjet cutting technology is a manufacturing process that uses...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »