Close
WORLD OF CONCRETE
Wednesday, December 10, 2025
JEC WORLD 2026

Brookfield Multiplex cleared to start Bishopsgate tower

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Leasing heavy construction equipment provides relief during economic upheaval

Many businesses are feeling the effects of economic uncertainty:...

Is a whole-house solar generator a new energy project?

Whole-house solar generators have emerged as one of the...

The Future of Construction: Modular Technologies, Smart Homes, and Digital Twins

2035: How Your Children Will Build Picture this. Your son...
- Advertisement -
Achema Middleeast

Jacobs wins Irish road safety contractHill to manage costs on 234ha Moroccan resort projectLaing O’Rourke officially signs Brighton hospital contractArcadis wins project manager role for £1bn Manchester Airport expansionPort expansion project awarded for Panama Canal

Construction of a 64-storey tower at 22 Bishopsgate in the City of London has been signed off by the Mayor of London.

This is the final approval process for the project after the Corporation of the City of London gave planning permission last month.

Brookfield Multiplex will begin construction in the first quarter of 2016 and is expected to complete in 2019. At 295 metres high, the new building will (doubtless temporarily) be the tallest in the Square Mile, though not as tall as the Shard across the river at London Bridge. Both buildings are engineered by WSP.

It is being built in the place of the partially constructed Pinnacle tower, which was abandoned in 2012 after seven storeys as a result of the economic downturn.

 

Achema Middleeast

Latest stories

Related stories

Leasing heavy construction equipment provides relief during economic upheaval

Many businesses are feeling the effects of economic uncertainty:...

Is a whole-house solar generator a new energy project?

Whole-house solar generators have emerged as one of the...

The Future of Construction: Modular Technologies, Smart Homes, and Digital Twins

2035: How Your Children Will Build Picture this. Your son...

Leading GPS Time Tracking Apps for Construction Teams in the US (2026)

Introduction Construction teams often face challenges tracking labor hours across...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »