Close
MCE 2026
Sunday, March 15, 2026
2026 Mining Türkiye Exhibitor List

Cemex supplies pre-cast concrete for German oncology centre

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

John Holland Selects Ivalua for Construction Procurement

Construction and infrastructure company John Holland has selected Ivalua’s...

Precision Hardware Components Enhancing Building Reliability

Utilizing precision hardware components building reliability ensures that mechanical systems and structural assemblies function with absolute consistency, reducing maintenance costs and extending the lifespan of the built environment.

Structural Support Systems Improving Building Stability

The strategic implementation of structural support systems building stability ensures that modern architectural wonders can withstand immense gravitational and lateral forces while maintaining long-term safety and performance.
- Advertisement -

Mexico-based Cemex SAB de CV has announced that Cemex in Germany has supplied semi-finished, prefabricated ceilings and double wall elements of reinforced concrete for the Westdeutches Tumorzentrum wing, the oncology centre of the university hospital in Essen, Germany. The new seven-storey ultra-modern wing is designed to treat up to 130 oncologic in-patients.The 1,208 square metres of prefabricated double wall elements, each more than three metres in height, were used for the elevator shafts and a three-storey annex linking the new wing to an adjacent building. All of the walls were constructed as stiffening walls to counteract horizontal load components such as overturning and twisting. 

Cemex has also provided a total of 9,347 square metres of prefabricated ceilings, from the first basement floor to the roof edge on the fifth floor. Each story, requiring about 1,500 square metres of ceiling, was installed within three to four days.The prefabricated concrete elements of the WTZ wing proved an economical and technically sophisticated solution to the challenges posed by this building’s exacting specifications.

Achema Middleeast

Latest stories

Related stories

John Holland Selects Ivalua for Construction Procurement

Construction and infrastructure company John Holland has selected Ivalua’s...

Precision Hardware Components Enhancing Building Reliability

Utilizing precision hardware components building reliability ensures that mechanical systems and structural assemblies function with absolute consistency, reducing maintenance costs and extending the lifespan of the built environment.

Structural Support Systems Improving Building Stability

The strategic implementation of structural support systems building stability ensures that modern architectural wonders can withstand immense gravitational and lateral forces while maintaining long-term safety and performance.

Ventilation Strategies Supporting Healthy Buildings

The implementation of advanced ventilation strategies healthy building environments is essential for maintaining superior indoor air quality and ensuring the cognitive performance and physical wellbeing of building occupants.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »