Tuesday, March 31, 2026
2026 Mining Türkiye Exhibitor List

Cemex supplies pre-cast concrete for German oncology centre

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Aqua-G EVO Debut Strengthens Panasonic HVAC Portfolio Range

Panasonic has introduced a new propane-based heat pump aimed...

Future Homes Standard 2026 Drives UK Construction Shift

The UK government has confirmed the implementation of the...

On Site Quality Control Enhancing Construction Outcomes

The rigorous application of on site quality control construction outcomes ensures that every phase of a build adheres to the highest engineering standards, preventing defects and guaranteeing long-term structural reliability.
- Advertisement -

Mexico-based Cemex SAB de CV has announced that Cemex in Germany has supplied semi-finished, prefabricated ceilings and double wall elements of reinforced concrete for the Westdeutches Tumorzentrum wing, the oncology centre of the university hospital in Essen, Germany. The new seven-storey ultra-modern wing is designed to treat up to 130 oncologic in-patients.The 1,208 square metres of prefabricated double wall elements, each more than three metres in height, were used for the elevator shafts and a three-storey annex linking the new wing to an adjacent building. All of the walls were constructed as stiffening walls to counteract horizontal load components such as overturning and twisting. 

Cemex has also provided a total of 9,347 square metres of prefabricated ceilings, from the first basement floor to the roof edge on the fifth floor. Each story, requiring about 1,500 square metres of ceiling, was installed within three to four days.The prefabricated concrete elements of the WTZ wing proved an economical and technically sophisticated solution to the challenges posed by this building’s exacting specifications.

Achema Middleeast

Latest stories

Related stories

Aqua-G EVO Debut Strengthens Panasonic HVAC Portfolio Range

Panasonic has introduced a new propane-based heat pump aimed...

Future Homes Standard 2026 Drives UK Construction Shift

The UK government has confirmed the implementation of the...

On Site Quality Control Enhancing Construction Outcomes

The rigorous application of on site quality control construction outcomes ensures that every phase of a build adheres to the highest engineering standards, preventing defects and guaranteeing long-term structural reliability.

Efficient Installation Drives Large-Scale Building Projects

Maximizing installation efficiency large scale building projects is the primary lever for accelerating construction schedules and ensuring that complex architectural systems are assembled with absolute precision and minimal waste.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »