Close
WORLD OF CONCRETE
Friday, December 19, 2025
JEC WORLD 2026

Cemex supplies pre-cast concrete for German oncology centre

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

RMIT Researchers Turn Coffee Waste into Low-Carbon Concrete

RMIT University, Australia researchers are coming up with a...

Reducing Project Variability Through Predictive Logistics and Real-Time Monitoring

Predictive analytics, GPS-enabled fleet management, and data-driven delivery forecasting help avoid delays and reduce uncertainty. Real-time monitoring improves coordination between factory and site operations enabling more reliable project execution.

The Key Trends Shaping the Construction Industry in 2026

The construction industry stands at a critical inflection point,...
- Advertisement -
Achema Middleeast

Mexico-based Cemex SAB de CV has announced that Cemex in Germany has supplied semi-finished, prefabricated ceilings and double wall elements of reinforced concrete for the Westdeutches Tumorzentrum wing, the oncology centre of the university hospital in Essen, Germany. The new seven-storey ultra-modern wing is designed to treat up to 130 oncologic in-patients.The 1,208 square metres of prefabricated double wall elements, each more than three metres in height, were used for the elevator shafts and a three-storey annex linking the new wing to an adjacent building. All of the walls were constructed as stiffening walls to counteract horizontal load components such as overturning and twisting. 

Cemex has also provided a total of 9,347 square metres of prefabricated ceilings, from the first basement floor to the roof edge on the fifth floor. Each story, requiring about 1,500 square metres of ceiling, was installed within three to four days.The prefabricated concrete elements of the WTZ wing proved an economical and technically sophisticated solution to the challenges posed by this building’s exacting specifications.

Achema Middleeast

Latest stories

Related stories

RMIT Researchers Turn Coffee Waste into Low-Carbon Concrete

RMIT University, Australia researchers are coming up with a...

Reducing Project Variability Through Predictive Logistics and Real-Time Monitoring

Predictive analytics, GPS-enabled fleet management, and data-driven delivery forecasting help avoid delays and reduce uncertainty. Real-time monitoring improves coordination between factory and site operations enabling more reliable project execution.

The Key Trends Shaping the Construction Industry in 2026

The construction industry stands at a critical inflection point,...

Digital Twins as the Backbone of Predictability in Prefabricated Construction

Key Takeaways Digital twins create virtual replicas enabling production...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »